Title Page
-
Site
-
Director Name:
-
Date
-
Project Manager:
-
Number of operatives on site
-
Approximate number of operatives observed during inspection:
Site Safety Performance
-
What is the projects current Training Matrix compliance? Is it above 90%?
-
What is the projects current LMS Matrix compliance? Is it above 90%?
-
Is there good participation in the SOR programme?
-
Is there good participation in the BBS programme on site?
-
Has the EHS Minimum Performance Requirements (COR-EHS-HS-PLN-003) document been distributed to the Management team and to subcontractors?
-
Is there a HRA Audit and Campaign Plan in place on the project?
Adherence to EHS Minimum Performance Requirments
-
Are adequare number of work benches in place and have g-clamps or vice at location? (Note - 1:4 ratio for benches)
-
Are there adequate storage racks in place on site?
-
Are there adequate mechanical means available to assist with manual handling activities?
-
Are adequate storage facilities in place for chemicals / gas bottles etc.?
-
Are there suitable arrangements in place to offload and manoeuvre materials/plant (incl. MEWPS) on site?
-
Is the COHE procedure being complied with? Are all appointments in place?
-
Is temporary works being carried out in line with site procedure? Are appointments in place?
-
Is EHS promotion (posters etc.) visible in site offices / welfare facilities / work areas?
Site Conditions
-
Is there safe access to work areas?
-
Are high housekeeping standards maintained?
-
Is correct PPE available and correctly being used? Is PACE logo on hi-vis and chin straps being used?
-
Is there appropriate barricading and signage?
-
Are Lift Plan Checklists (COR-EHS-HS-FRM-061) available for all site lifts?
-
Were safe behaviours observed on site?
-
Are there any other comments from site walk?
SIGN OFF
-
Auditors Signature: