Information
-
Account Name
-
Post Code
-
Brewery Job number
-
Zafire Job number
-
Site contact personal
-
Engineers
-
Conducted on
-
Audit completed by
All Post installation Audits should be completed using these guidelines as a reference to determine the standard of an installation. This document defines the three Post Installation Audit classifications:- • Pass • Brand Owner Fail • T&J Installations Fail Wherever possible a copy of the installation completion sheet should be obtained for any snagging issues or relevant information to the installation to be taken into consideration. Pass- Product installed to installation specification and brand dispense specification. Brand Owner Fail- Product installed with one of three key specification’s not being adhered to • Branding, including soft touch where applicable. Incorrect Tap, T-bar lens or fount used versus Brand spec. • Dispense speeds set incorrectly. No tolerance given if recorded out of specification on tech completion sheet. • Temperature of a product above product specification. After advising brewery it will be out of spec. T&J Fail- Non Adherence to brand specs (BO Failure) or an Issue with an installation which is likely to result in a maintenance call to rectify. Audits will be completed in a way directly related to the installation Required Services
Bar
-
Are all Plaqs and badges installed ?
-
Are all lights working ?
-
Are all products dispensing correctly as per there specification ? (Temp and Speed)
-
Are there any product or water leaks ?
-
Are pythons Secure ?
-
Is all pipe work under the bar lagged ?
-
Does installation of secondary cooling exceeding python BDA ?
-
Is secondary cooling installed correctly ? (traced cooled and secure)
-
Are fonts/Tbars installed correctly ? (traced cooled and secure)
-
Are Lighting Transformer installed correctly ? (not overloaded or secured)
-
Are Flow controllers labeled with the product name ?
-
Are all hand pulls installed correctly ? (traced cooled and secure)
-
Are check vales Secure and out of glass space ?
-
Bar Comments
Cellar
-
Tidy Install ?
-
Are Gas ring Mains looped where 3 or more secondary’s on same supply ?
-
Are Cleaning ring main looped on where 3 or more cleaning sockets on same supply
-
Is the correct pipe colour used for Gas rings ?
-
Is the correct pipe colour used on drop lines ?
-
Are Product lines in correct pipe ? (3/8 or 1/2)
-
Are anti strain devices fitted on keg drops ? (where spec req)
-
Are bleed pipes fitted to fobs ? (not linked)
-
Are Gas pumps vented to Outside of the building ?
-
Is the correct pipe colour used for vent ? (clear / natural pipe)
-
is the product gas pressure correct ? ( tolerance +/- 2PSI to cellar Temp)
-
Is air compressor fitted correctly ? (gas back up connected)
-
Is the Water Bath at correct level ? (topped up after install of pod/plate)
-
Is the Return flow temperature less than 3°C and more than 4 litres flow rate ?
-
Is the water bath @ the correct Glycol % ? ( 70% )
-
Is the heat dump tank @ the correct level and the correct glycol % ? ( 30% )
-
Is there identification of product lines on cooler in and out ? (when new line installed)
-
is there identification of which python feeds which bar ? (when python is installed)
-
Are Gas COP cards fitted (Specific to brand owner) and displayed where primary gas valve or compressor fitted ?
-
Are cellar charts installed to new outlet or cellar enhancement ?
-
Cellar Comments
Customers impression (Must Answer all Questions)
-
Did the engineers talk you through the install before starting and kept you up to date through the works ?
-
Was the site area safe for the public etc?
-
Did the engineers clean up after them ? (at the end of the job and through out install)
-
Did the engineers explain what they did and how it all works to your satisfaction ?
Auditors Findings (Must Answer all Questions)
-
Is there any remedial works needed ?
-
Did labour on job card / allocated match hours worked by technicians ?
-
Did chargeable equipment used/returned match equipment on site
-
Audit Score ?
-
Auditors Signature