Information

  • Job No.

  • Area

  • Conducted on

  • Prepared by

Pre-Installation Meeting

  • Notification of meeting date, time and location issued to all installers

  • Approved submittals reviewed with installer

  • Select date

  • Add signature

  • Confirm blocking type for roof applications

  • Select date

  • Add signature

  • Confirm blocking type for interior applications

  • Select date

  • Add signature

  • Confirm blocking type for exterior window/door applications

  • Select date

  • Add signature

  • Verify locations and mounting heights for blocking and label on drawing plans

Material Delivery and Storage

  • Confirm products are per approved submittals

  • Verify products are in good condition and properly stored to prevent moisture damage

Construction Monitoring

  • First work inspection completed by Danis

  • Select date

  • Add signature

  • Add media

  • Pre-Drywall installation inspection completed by Danis

  • Select date

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.