Risk Evaluation Matrix
Hazard Checklist
-
01. Do I understand the task/work?
-
02. Am I trained, competent and authorised to do this task?
-
03. Are tools/equipment fit for purpose and task/work?
-
04. Can I be injured by nearby activities or can my activities injure others nearby?
-
05. Can I strain or over exert myself?
-
06. Can I slip or trip on anything?
-
07. Can I fall onto, into or from anything?
-
08. Can something fall on me or can I cause something to fall onto someone else?
-
09. Can I come into contact with or be exposed to something that may harm me?
-
10. Does anything need to be isolated and tested for dead? (e.g. electrical, hydraulics, gas)
-
11. Can I spill or pollute something?
-
12. Can weather conditions or work environment affect job safety? (e.g. poor lighting, tidal zones, excessive heat or cold, storms, etc.)
-
13. Will communications reception be limited while doing the task?
-
14. Is there a safer way I can do the task?
-
15. Do I need to report into Field Ops (eg. 3 Messaging) while this task is being done?
-
16. Are there any other hazards that need to be accounted for?
-
17. Have I got the required PPE/provisions?