Information
-
Audit ID
-
Audit Location
-
Supervisor
-
Conducted by
-
Audit Date
Documentation
-
Is official documentation received in a timely manner from the engineering department?
-
Who receives documentation for the area?
-
Are substitutions documented?
-
Is the traveler completed correctly?
-
Is the traveler submitted when work is complete?
-
Is scrap material documented?
-
Are scrap tickets submitted correctly?
Production
-
Is there adequate time to plan and prepare for production?
-
Is there any item or issue that slows down production in this area?
-
Are parts/materials made without official paperwork? (cheat sheets, hand written notes, or etc. do not count)
-
Are materials/parts labeled correctly throughout production process?
-
Is there a designated area for storage once work is complete?
-
Is information passed effectively from day shift to night shift?
Safety & Housekeeping
Answers are based on a scale of 1-10. 1 can be considered as needing improvement, 5 is adequate, and 10 is optimal.
Comments
-
Employee Comments, if any:
-
Auditor's Final Comments:
Review
-
Follow-Up Required:
-
When?
-
Employee Audited:
-
Auditor:
-
Audit Completed: