Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
site information
-
work order number
-
task activity
-
date
-
Site number/Name
check applicable anticipated or potential hazards
-
Equipment Removal
-
Cabling Ceiling, Walls and Flooring
-
Rough in Mechanicals
-
Bracket Fit Off
-
Cable Terminations
-
Equipment Fit Off
-
Programming
-
Commissioning
-
Other (specify) :
critical procedures: where work involves any of the following hazards must be incorporated into JSA
-
Work at heights above 1.5m
-
Confined Space Entry
-
Heavy Mechanical Fit Off
-
Heavy Lifting
ensure all hazards identified are addressed in JSA below
-
1. sequence of basic job Step in order
-
1.potential hazards.
-
1.safety controls to reduce or eliminate hazard
-
2. sequence of basic job Step in order
-
2. potential hazards.
-
2. safety controls to reduce or eliminate hazard
-
3. sequence of basic job Step in order
-
3. potential hazards.
-
3.safety controls to reduce or eliminate hazard
-
4. sequence of basic job Step in order
-
4. potential hazards.
-
4.safety controls to reduce or eliminate hazard
-
5. sequence of basic job Step in order
-
5. potential hazards.
-
5.safety controls to reduce or eliminate hazard
Tools / Equipment ( list of tools and equipment if relevant to safety)
-
List
Additional PPE ( minimum requirement: safety boots, hard hat, visi-vest, glasses, gloves)
-
Eye Protection
-
Hearing Protection
-
Hand Protection
-
Dust Protection
-
Fall Protection
-
Other (fire retardant coveralls, breathing apparatus, etc) specify :
Outside Authorities
-
Name/Title
-
Signature
DPI Staff Signatures
-
Staff Sign Off
-
Add signature
-
date
Site Contact Signature
-
JSA approved signature
-
date