Information
-
Location:
-
Date:
-
Road ID NO#:
-
Job Number:
-
Weather Conditions:
-
Crew Members:
-
Steps:
-
Safety precautions - Sign set out - Hazard identification - Services
-
Enviro impacts - run off, spill potential, fuelling, dump sites, slit fences
-
Define and mark out area
-
Excavate the drainage trench to specifications
-
Lay specified filter cloth in trench if required and pin flaps to trench sides
-
Place drainage material onto filter cloth and compact to specification
-
Place drain pipe/coil onto drainage material and extend pipe / coil minimally beyond fill
-
Fold both flaps of filter cloth over the drainage material if necessary
-
Backfill with specified basecourse and compact to required level
-
Clean up and exit site
-
Depth of excavation?
-
Type of drainage pipe?
-
Type of drainage material?
-
Grade of filter cloth?
-
Size of drainage pipe/coil?
-
Type of basecourse?
-
Comments:
-
Foreman / Leadhand's Signature:
-
Date: