Subsoils under channel carriageway - Repairs to Kerb and channel - Drainage structure repairs and maintenance

  • Designs / Specifications / Programme on Site

  • Initial:

  • Gradient alignment, line and depth of trench as per requirements

  • Initial:

  • Backfill material used (GAP 65 / GAP 40 / AP 40 / AP 20 / F2)

  • Initial:

  • Backfill and compaction in stages with correct materials as per standards - Clegg results

  • Initial:

  • Jointing to manufactures specifications, full length supported

  • Initial:

  • Height of drainage material above pipes

  • Initial:

  • Discharge clear of embankments, manhole / CP connections sealed by plastering

  • Initial:

Footpath Contrustion

  • Edges saw cut

  • Initial:

  • Excavated materials removed from site

  • Initial:

  • Subgrade firm natural clay (CBR>=3)

  • Initial:

  • Basecourse minimum 50mm compacted GAP 20 - (CBR>=10)

  • Initial:

  • Concrete prepour inspection

  • Initial:

  • Correct concrete used : 20 MPA 100mm thick (minimum width 1.2)

  • Initial:

  • Vehicle Crossing / Have Duty 150mm thick

  • Initial:

  • Correct finish: Red exposed chip

  • Initial:

  • Reinstatement complete - including berms

  • Initial:

  • Surface covers raised / lowered

  • Initial:

  • Joint sealing completed

  • Initial:

  • Line marking reinstated

  • Initial:

  • Concrete prepour

  • Initial:

  • Channel width to 300mm

  • Initial:

  • Kerb haunching within 50m of top

  • Initial:

  • Joint spacing 10-20mm

  • Initial:

  • Pointing complete

  • Initial:

  • Kerb reveal to 150mm

  • Initial:

  • Channel expansion joints cut

  • Initial:

  • Topsoil and seeding (after pointing)

  • Initial:

  • 50mm lip on driveways

  • Initial:

  • Excavated materials removed from site

  • Initial:

  • Pins removed

  • Initial:

  • Vehicle crossings expansion joints cut

  • Initial:

  • Vehicle crossing exposed concrete?

  • Initial:

  • Catchpits sealed / pointed?

  • Initial:

  • Additional Information:

  • Signature:

  • Date:

  • Supervisor:

  • Insitu Test Map

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.