Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Previous inspections and actions
-
Are there any outstanding action items arising from previous contacts, internal audits, inspections, incidents etc?
-
Have the created actions been effective in addressing the issues raised?
Hydrocarbon / chemical management
-
Is there evidence drilling product or contaminated soil remaining on pad?
Paperwork checks
-
Is the SWP current and complete?
-
Have employees and contractors completed Environmental training?
-
Does Protrak reflect the current status of the drill collar i.e. rehabilitated?
Work area checks
-
Are collars capped and secured?
-
Are collars buried to depth and mounded?
-
Are the sumps adequately designed and compliant?
-
Is the discharge T-piece directed into the sump?
-
Is all discharge contained and quality compliant?
-
Is the pad design compliant with OK&P drill pad templates?
-
Are drill pad modifications made safe?
-
Has all rubbish and remaining equipment been removed?
Rehabilitation
-
Has rehabilitation of tracks been complete / planned? Check on Protrak.
-
Has topsoil and vegetation been stockpiled?
Housekeeping
-
Are there any other arising issues?
Findings and actions
Sign-off
-
Environmental Representative
-
Add signature
-
Work area representative
-
Add signature