Information

  • Service Order No.

  • Customer Name

  • Visit date

  • Location
  • Perkin Elmer Service Engineer

Planned Maintenance Record

General

  • Ask user about performance since last visit

  • Check incoming AC line voltage for proper levels and grounding

  • Check purge gas flow

  • Inspect and clean cooling fans / vents

  • Inspect and clean interior as needed

Mechanical / Performance Tests

  • Check firmware version. Upgrade to current levels if necessary

  • Measure all accessible power supply voltages

  • Check operation of instrument display

  • Inspect furnace and lids. Clean if necessary

  • Check Autosampler operation. Adjust if necessary

  • Check cooling system operation

  • Check baseline

  • Check for noise

  • Perform full temperature and heat flow calibration. <br>Note heating rate & calibrated Indium results (156.6°C / 28.45J/g)

  • Heating Rate (°C/min) :

  • Indium Onset (°C) :

  • Indium Heat Flow (J/g) :

  • 2nd Standard Used (for reference only)

  • Tap to enter information

  • Clean exterior of instrument

Review

  • Review work performed with user

  • Review routine maintenance procedures with user

  • Discuss recommended consumables to have on hand

  • Perkin Elmer Service Engineer

  • Customer Representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.