Information

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

Signing In

  • HAVE ALL TRADES SIGNED IN/OUT OF THE SITE REGISTER

  • TAKE PHOTOGRAPH WITH SIGN IN AND SIGN OUT TIMES SHOWN

  • HAS SITE MANAGER COMPLETED A PERMIT TO WORK

PRE CHECKS AT START OF SHIFT

  • DID THE TRANSPORT ARRIVE TO SITE BEFORE START TIME. IF NO PLEASE PROVIDE DETAILS

  • DID ALL VIP FITTERS ARRIVE BEFORE START TIME. IF NO PLEASE PROVIDE DETAILS

  • HAVE ALL MATERIALS AND FIXINGS BEEN CHECKED AGAINST THE PICK LIST AND ANY SHORTAGES REPORTED

  • ARE ALL MATERIALS UN-DAMAGED. IF NO PLEASE TAKE A PHOTOGRAPH

  • ARE ANY EXISTING CEILING TILES DAMAGED OR DIRTY BEFORE WORK COMMENCES (TAKE PHOTO)

  • PLEASE PHOTOGRAPH ALL BEFORE STARTING INSTALL

INSTALLATION CHECKLIST – TO BE COMPLETED BEFORE SIGNING OFF ANY INSTALLATION TEAM

  • IS ALL KIT INSTALLED AS PER CURRENT DRAWING

  • ARE ALL DIMENSIONS CORRECT TO THE CURRENT DRAWING

  • TAKE PHOTOGRAPHS

  • ARE ALL FIXINGS USED BLACK IN COLOUR

  • TAKE PHOTOGRAPHS

  • ARE ALL ITEMS INSTALLED SECURED AND UNDAMAGED

  • TAKE PHOTOGRAPHS

  • HAVE ALL SUPPLIED FIXINGS BEEN INSTALLED

  • TAKE PHOTOGRAPH

  • ARE ALL GONDOLAS SECURE WITH FIXINGS

  • TAKE PHOTOGRAPH

  • ARE ALL FITTING ROOM DOOR END PANELS SECURELY FIXED

  • ARE ALL FITTING ROOM DOORS OPENING, SHUTTING AND LOCKING PROPERLY

  • TAKE PHOTOGRAPHS

  • ARE ALL MESH WALL SYSTEMS INSTALLED CORRECTLY AND SECURED WITH FIXINGS

  • TAKE PHOTOGRAPHS

  • IS THE CEILING ABOVE WORK AREA FREE FROM DIRT AND HAND PRINTS

  • HAS REVERSE WALL SYSTEM AND DENIM WALL SYSTEM BEEN CORRECTLY FITTED AND INSTALLED WITH ALL FIXINGS

  • TAKE PHOTOGRAPHS

  • HAVE ALL VIP FITTING TEAM REVIEWED THE INSTALLATION AND REPORTED ANY OUTSTANDING WORK OR SNAGS

  • HAS ALL REDUNDANT EQUIPMENT, MATERIALS AND RUBBISH BEEN REMOVED FROM THE SHOP FLOOR AND LEFT CLEAN AND TIDY FOR OTHER TRADES BEFORE LEAVING SITE

  • ARE ALL KEYS WITH EACH DRAWER AND CUPBOARD ON CASHDESK

  • PLEASE TAKE PHOTOS DISPLAYING KEYS

INSTALLATION SUMMARY

  • WERE THERE ANY ISSUES THAT DELAYED THE INSTALLATION. IF YES PLEASE PROVIDE DETAILS

  • HAVE ANY PARTS BEEN USED FROM YOUR CONTINGENCY KIT DURING THE SHIFT. IF SO PLEASE PROVIDE DETAILS SO THAT REPLACEMENT STOCK CAN BE ORGANISED

  • HAS THE SITE MANAGER WALKED THROUGH YOUR TEAMS INSTALL

Names and Signatures

Team Lead

  • Signature

Client/Site Manager

  • Company

  • Position

  • Signature

  • Date and time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.