Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Laboratory services

  • Testing laboratory personnel been orientated

  • Prep meeting held with testing lab

  • Testing lab daily log dropped off at NSB field office <br>

  • Soil samples taken by testing lab

  • Proctors been approved

  • Select fill or flex base samples been picked up by testing lab

Erosion control

  • Erosion control measure in place per SWPPP plan

  • SWPPP plan posted in field office and updated regularly

  • SWPPP plan has job trailer,restrooms,lay down, construction entrances,employees parking identified

  • N.O.I. Received and posted on site in public view

  • Dust control measures in place

  • Silt fence installed around stockpile top soil? If stockpiled longer than 14 days

  • Streets clean and being maintained

  • Construction entrances been established

Documentation and verification

  • Site specific safety program( training requirements) delivered and on site

  • Site specific HAZCOM and safety program on site

  • Have we taken photos of existing conditions<br>

  • Have all utilities been identified and located and potholed

  • Building corners been established with proper off sets

  • Benchmark been verified and acknowledged by subcontractors

  • On site fuel storage

Safety

  • Utilities been located and potholed

  • All equipment operators been trained and documented

  • Safety vests being worn on site

  • No cracked or broken windshields on equipment

Earthwork requirements

  • Any scheduled trees on site to remain and have they been protected by fencing etc?<br>

  • Any do not disturb area's on site and are they identified and protected

  • Measures in place to protect adjacent property in applicable

  • Sub grade scarified and compacted and observed by testing laboratory

  • Testing required at building pad<br><br>

  • Testing requirements at paving

  • Testing requirements at general fill area's

  • Percent compaction required and moisture content required

  • Area been identified to stock topsoil

  • Parking lots to receive lime stabilization

  • Requirements of lime stabilization reference specifications

  • Requirements at general fill area's (landscaping etc.)

  • Depth of top soil required on project

  • Top soil been processed by screening before placement, no rocks,wood debris over 1/2" diameter

  • Are there retaining wall on project, if so special requirements for backfill( reference soils report)

  • Have we verified cut back operations for retaining walls and backfill staging area

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.