Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Laboratory services
-
Testing laboratory personnel been orientated
-
Prep meeting held with testing lab
-
Testing lab daily log dropped off at NSB field office <br>
-
Soil samples taken by testing lab
-
Proctors been approved
-
Select fill or flex base samples been picked up by testing lab
Erosion control
-
Erosion control measure in place per SWPPP plan
-
SWPPP plan posted in field office and updated regularly
-
SWPPP plan has job trailer,restrooms,lay down, construction entrances,employees parking identified
-
N.O.I. Received and posted on site in public view
-
Dust control measures in place
-
Silt fence installed around stockpile top soil? If stockpiled longer than 14 days
-
Streets clean and being maintained
-
Construction entrances been established
Documentation and verification
-
Site specific safety program( training requirements) delivered and on site
-
Site specific HAZCOM and safety program on site
-
Have we taken photos of existing conditions<br>
-
Have all utilities been identified and located and potholed
-
Building corners been established with proper off sets
-
Benchmark been verified and acknowledged by subcontractors
-
On site fuel storage
Safety
-
Utilities been located and potholed
-
All equipment operators been trained and documented
-
Safety vests being worn on site
-
No cracked or broken windshields on equipment
Earthwork requirements
-
Any scheduled trees on site to remain and have they been protected by fencing etc?<br>
-
Any do not disturb area's on site and are they identified and protected
-
Measures in place to protect adjacent property in applicable
-
Sub grade scarified and compacted and observed by testing laboratory
-
Testing required at building pad<br><br>
-
Testing requirements at paving
-
Testing requirements at general fill area's
-
Percent compaction required and moisture content required
-
Area been identified to stock topsoil
-
Parking lots to receive lime stabilization
-
Requirements of lime stabilization reference specifications
-
Requirements at general fill area's (landscaping etc.)
-
Depth of top soil required on project
-
Top soil been processed by screening before placement, no rocks,wood debris over 1/2" diameter
-
Are there retaining wall on project, if so special requirements for backfill( reference soils report)
-
Have we verified cut back operations for retaining walls and backfill staging area