Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Drawings and Specifications

  • All addenda been posted

  • All subcontractors acknowledge addenda

  • List addenda

Submittals

  • Have submittals been received<br>

  • Have submittals been approved

  • Mix designs submitted and approved

  • Joint layouts for slabs and paving

  • Subcontractor acknowledges all addenda

Testing requirements and visual inspections

  • Subcontractor aware all retesting fee's is their responsibility?

  • Sub grades verified by concrete contractor and accepted

  • Compaction at grade beams

  • Rebar chairs proper height

  • Vapor barrier correct thickness and installed properly

  • Anchor bolts straight and protected from concrete

  • Joint layout on slab approved by structural engineer

  • City inspection required and being performed

  • Termite treatment set up prior to slab placement

  • Recess's in floor slabs in proper locations

  • Vibrators on site for concrete placement

  • Slump for piers,grade beams,slabs,paving

  • Rebar installed per approved shop drawings

  • Concrete strength requirements for piers,grade beams,slabs,paving and air content

  • Hot weather and cold weather concrete discussed

  • Storage boxes for cylinders provide by subcontractor<br>

  • Number of cylinders and frequency of cylinders

Safety

  • Site specific safety program documentation received

  • Site specific safety and HAZCOM program received

  • Safety caps installed on all vertical rebar

  • Slurry from saw cutting been clean up

  • Vests being worn on site

  • Equipment operators been trained and documented

  • Equipment being inspected

  • Valid fire extinguishers on equipment

  • Light towers on site for early morning placements?

  • Pier holes protected when drilling and after drilling

  • Concrete trucks are aware of routes to follow on site

Environmental

  • Erosion control in place

  • Has erosion control been disturbed

  • Has erosion control been repaired if disturbed

  • Fuel being stored on site

  • Equipment leaking fluids

  • Curing compounds being properly stored and contained

  • Washout pit installed with liner and signage

  • City contacted for work hours for concrete placement (early morning placements)

  • Select date

  • Add signature

  • Add signature

  • Add signature

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.