Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • what 3 words - https://what3words.com/ screenshot

Property

  • Property approximate date of build

  • Property type

  • Floors

  • Wall construction

  • Image of Right hand side of property - with roof and ground in

  • Image of Rear of property - with roof and ground in

  • Image of Left hand side of property - with roof and ground in

  • Image of extension of property - with roof and ground in if applicable

  • Image of smaller extension of property - with roof and ground in if applicable

  • Add scope of all walls requiring cavity wall insulation

External condition of property

  • Roof condition - is the roof of the property in good condition please supply multiple images of roof and tile type

  • Are the gutters in good order with no visible signs of leaking down the wall please supply images as evidence

  • Does the property have vines/ bushes growing up or touching the walls please supply evidence

  • Is the Damp proof course visible at least 100mm above ground all the way around the property

  • are there any immovable obstructions which are bigger than 1.5m wide and 1m deep i.e shed, coal house, lean too that prevents ladders being erected

  • Can a standard cavity wall insulation drill pattern be completed without internal drilling

  • Has the neighbour been insulated

Services

  • Picture of whole electric meter area and close up of Mpan/serial number

  • Picture of whole gas meter area and close up of Mpan/serial number

  • picture of whole consumer unit area and close up of switches

  • are there spare ports in the consumer unit

  • Picture of stop tap location

Internal property damp and ventilation

  • Is there evidence of damp in the property

  • Take a damp meter reading on all walls requiring CWI

  • Agreed DMev/extractor locations

  • Does the property have an aga, open/coal fires, gas fires over 7 kw, wood burners over 5 kw, flueless or open flued boilers - if yes corevent will be required and need evidence of agreed location

  • Agreed trickle vents and door shavings if required

Roof space

  • Does the roof space appear load bearing

  • Are there signs of daylight coming through the roof

  • does the loft feel dry and free from condensation and leaking

  • Is there evidence of vermin infestations / to include nesting birds and bats

  • What is the pitch of the roof that is having solar

  • What is the joist spacing, depth and width

  • Does inverter location require fire board / walk way

  • Does the customer have fixed ladders

  • Is there lighting in the loft

  • Size of loft hatch

ASHP And Emitters

  • Does the property already have radiators - if no measure potential areas available - if yes measure rads that are in

  • What are the floor construction

Does the property require remedial works

  • What is required to perform install

  • is there any other issues to be resolved before install

Deliveries/ parking

  • Image of parking area

  • Agree area for deliveries

  • Agreed area for rubbish store and collection within 7 days post install

Declaration

  • Surveyor has shown me the survey, explained the findings and I am happy that the survey has been completed and all areas left tidy

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.