Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
what 3 words - https://what3words.com/ screenshot
Property
-
Property approximate date of build
-
Property type
-
Floors
-
Wall construction
- Brick
- Marshal stone
- Random Stone
- Concrete
- Breeze block
- Abnormally thick
-
Image of Right hand side of property - with roof and ground in
-
Image of Rear of property - with roof and ground in
-
Image of Left hand side of property - with roof and ground in
-
Image of extension of property - with roof and ground in if applicable
-
Image of smaller extension of property - with roof and ground in if applicable
-
Add scope of all walls requiring cavity wall insulation
External condition of property
-
Roof condition - is the roof of the property in good condition please supply multiple images of roof and tile type
-
Are the gutters in good order with no visible signs of leaking down the wall please supply images as evidence
-
Does the property have vines/ bushes growing up or touching the walls please supply evidence
-
Is the Damp proof course visible at least 100mm above ground all the way around the property
-
are there any immovable obstructions which are bigger than 1.5m wide and 1m deep i.e shed, coal house, lean too that prevents ladders being erected
-
Can a standard cavity wall insulation drill pattern be completed without internal drilling
-
Has the neighbour been insulated
Services
-
Picture of whole electric meter area and close up of Mpan/serial number
-
Picture of whole gas meter area and close up of Mpan/serial number
-
picture of whole consumer unit area and close up of switches
-
are there spare ports in the consumer unit
-
Picture of stop tap location
Internal property damp and ventilation
-
Is there evidence of damp in the property
-
Take a damp meter reading on all walls requiring CWI
-
Agreed DMev/extractor locations
-
Does the property have an aga, open/coal fires, gas fires over 7 kw, wood burners over 5 kw, flueless or open flued boilers - if yes corevent will be required and need evidence of agreed location
-
Agreed trickle vents and door shavings if required
Roof space
-
Does the roof space appear load bearing
-
Are there signs of daylight coming through the roof
-
does the loft feel dry and free from condensation and leaking
-
Is there evidence of vermin infestations / to include nesting birds and bats
-
What is the pitch of the roof that is having solar
-
What is the joist spacing, depth and width
-
Does inverter location require fire board / walk way
-
Does the customer have fixed ladders
-
Is there lighting in the loft
-
Size of loft hatch
ASHP And Emitters
-
Does the property already have radiators - if no measure potential areas available - if yes measure rads that are in
-
What are the floor construction
- solid
- floor boards with sizable gap
- floor boards with small gap ( less than 45cm underneath)
- chip board
Does the property require remedial works
-
What is required to perform install
- Core vent
- internal drilling CWI
- roof works
- Dpc trench
- Dpc exposure
- Dpc install
- Vine/ hedges removal
- Vermin removal
-
is there any other issues to be resolved before install
Deliveries/ parking
-
Image of parking area
-
Agree area for deliveries
-
Agreed area for rubbish store and collection within 7 days post install
Declaration
-
Surveyor has shown me the survey, explained the findings and I am happy that the survey has been completed and all areas left tidy