Title Page
-
Project #
-
Project/Site
-
Date of Operation
-
Competent Person
Checklist
Items to Address
-
Is this operation a critical lift according to the Edwards Engineering crane lift program?
-
Has all personnel been briefed on the operation?
-
Has a safety plan or job safety analysis been required?
-
Have critical operations and/or air traffic been identified?
-
Have overhead obstructions and/or power lines been identified?
-
Have weather conditions and wind speeds acceptable to crane operator?
-
Is crane operator City of Chicago certified?
-
Is annual crane certification current?
-
Are all emergency devices functioning properly?
-
Have ground conditions been evaluated and accepted by crane operator?
-
Are outriggers being utilized per manufacturer requirements?
-
Is swing radius protection and barricading in place?
-
Has swing direction, landing zone, and load path been identified?
-
Have signaling communications been determined and reviewed?
-
Type of communications being used.
- 2 Way Radios
- Hand
- Verbal
- Other
-
Has load of weight been verified within crane chart?
-
Has rigging equipment been inspected and approved for use?
-
Are tag lines of non-conductive material being used?
-
Comments:
Required Information
-
Crane Operator
-
Rigging Person
-
Signaling Person
-
Crane Supplier
-
Crane Information
-
Person preparing checklist
-
Date
-
Crane lift checklist shall be completed in conjunction with the safety huddle. Completed checklists shall be forwarded to the Edwards Engineering Safety Manager within 24 hours of lift completion.