Title Page

  • Job#316774

  • Location/Floor/Elevation

  • Conducted on

  • Prepared by

  • Add signature

  • Location

AquaFlash windows and Expansion Joints

  • Ensure AquaFlash is applied at jamb flanges and head of window after window installation.<br>

  • Ensure there is a closed-cell backer rod installed in each expansion joint prior to AquaFlash.

  • Confirm Aquamesh overlaps the expansion joint a minimum of 2" on each side and is completely embedded into substrate with AquaFlash.

Drainage Strip

  • Has the drainage strip been installed at the heads of penetrations, base of wall, and at specified expansion/control joints?

  • Confirm the Drainage Strip is installed by applying dabs of AP Adhesive at 12" on center and ensure firm contact between the adhesive and the wall.

Backstop NT-Texture

  • Verify Dryvit Grid Tape is applied at all sheathing joints, inside and outside corners, and exposed edges not treated with AquaFlash or Flashing Tape.

  • Verify only enough Grid Tape as can be covered with Backstop NT-Texture in a day is applied.

  • Confirm a continuous film of Backstop NT- Texture is applied and fully embedded in Grid Tape

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.