Finish Coat Installation & Inspection
-
Confirm air and surface temperature to be 40 degrees or higher and must remain so for a minimum of 24 hours.
-
Have all irregularities and/or efflorescence in the base coat been corrected?
-
Confirm necessary primers/ sealers are applied properly.
-
Ensure finish will be installed continuously to a natural break.
-
Ensure work is done on the cool side of the building or use shade cloth. Verify that each mechanic uses the same tool and hand motion as the next.
Caulking
-
Verify that no finish material is applied in sealant joints.
-
Are all the caulk joints 3/4"(unless specified otherwise) and within tolerance?