Title Page
-
Add location
-
Electrical 1st Fix
-
Level
-
Plot Number
-
Conducted on
-
Prepared by
-
Installation Date
-
Comments
-
Add media
-
Installation by
-
Plots completed as per program and handed over ready for HES to start works.
-
Plot Inspected and was ready for 1st Fix
-
Windows Checked and Report sent
-
MUC and POD Inspected before and after installation works.
-
Comments
-
Installed to drawing numbers
-
Installation as per drawings
-
Comments
-
Kitchen Installation as per kitchen drawings
-
Comments
-
Dimensions and Heights correct by use of Laser Level.
-
Correct outlet boxes and caddy straps installed and all secure
-
Cables mechanical protection in place
-
LV Cables in position, labelled, neat, cable ties cut, cables secure, and with bends at 90 degrees and parallel.
-
ELV Cables in position, labelled, neat, cable ties cut, cables secure, and with bends at 90 degree and parallel
-
Fire stopping completed and installed with identification number label.
-
Lighting plug and play connectors fitted
-
Plot clear of materials, waste and swept out.
-
Plot photos
-
Snagging Issues
-
Snagging photos
-
Snagging items completed
-
Snags completed on
-
Completed snags
-
Comments and Feedback
-
Harrisons
-
Select date
-
Berkeley Homes
-
Select date
-
Handover completed