What installation is required and what is it to be used for
-
Exact location of installation <br>Please describe and<br>Add photo or diagram
-
Add diagram of location if required
-
Where is the supply to be fed from give Board designation and location (Proposed Distribution Board)<br>And photo of board showing spare ways
-
Note proposed circuit designation (Circuit in DB) to be used <br>note circuits not to be doubled up on existing supplies in distribution board
-
Where is the proposed Distribution board fed from.<br>And what type and size of over load protection is there for this board<br>Please add in notes and a photo of board and of over load protection
-
Size of over load protection required for new power supply including make and reference of Over load (Mcb or Fuse) please answer following questions<br>Make , rating , type and reference number required<br>Add photo of existing mcd or fuse
-
Is RCD protection required<br>If yes will it fit in the board or will a sub board be required
-
If a sub board is required what material will be needed including containment to couple board to MCB location <br>Ie Flexible conduit, conduit , conduit accessories,Trunking, Cable & glands,couplings and bushes<br>Add photo of proposed location
-
Cable for the new installation please answer these question<br>What cable type <br>What cable size<br>How many cores
-
What is the proposed cable route <br>Please add full description and photos if required
-
What cable length is required
-
What type of cable containment is required to be installed to route this cable <br>Please note below types and quantities<br>Eg , Clips, Cleats, Trunking, Conduit, Saddles, Tie wraps, Cable tray
-
What electrical accessories are required for the new supply<br>Note size and type <br>Ie sockets,isolators,Fused Connection units etc
-
List any other materials required in this section if not listed above
-
Number of men required and estimated time for installation<br>Please note if job needs to be done out of hours or normal hours please advise of any other working restrictions may apply
-
What type of access equipment will be required and approximate working height <br>Ie, Step ladders, Scaffold , cherry picker etc<br>Please note ground type if applicable <br>Note any access restrictions or relevant information please add a photo<br>
-
Add notes for any further information required
-