Title Page

  • Document No.

  • EOTF Intrusive Survey Catering Equipment

  • Client / Site

  • Conducted on

  • Prepared by JAC Electrical Service UK Ltd

  • Personnel

  • Site name & Number
  • Select date

  • Site Drawings Received? Note Drawing Reference<br><br>If no request a copy from Main Contractor

  • Does existing equipment require repair and/or replacement?<br>If yes please indicate<br>Make<br>Model<br>Serial<br>Further information regarding repair

  • Fry Station 1 APS Check if APS is present

  • Photo of APS position if possible And Fry Station

  • Fry Station 1 Gas Supplies Check for gas supplies to island

  • Is Fry Station being replaced?<br>If a 4 vat is being installed note for Fry Lead extensions<br>add notes that may be relevant

  • Fry Station 2 APS Check if APS is present

  • Photo of APS Position if possible and Fry station 2

  • Fry Station 2 Gas Supplies Check for gas supplies to Island

  • Is Fry Station being replaced?<br>If a 4 vat is being installed note for Fry Lead extensions<br>add notes that may be relevant

  • CFP Station APS Check if APS is present

  • Photo of APS Position if possible and CFP Station

  • CFP Station Gas Supplies Check for gas supplies to island

  • Is Fry Station being replaced?<br>If a 4 vat is being installed note for Fry Lead extensions<br>add notes that may be relevant

  • Is there any fixed refrigeration equipment on the CFP Station

  • Grill Station APS Check if APS is present

  • Photo of APS Position if possible and Grill Station

  • Grill island Gas Supplies Check for gas supplies to island

  • Is there any fixed refrigeration equipment on the Grill Station

  • Is Grill hood being replaced

  • If yes will Grill(s) require 3 lead to single 7 pin appliance adaptor plug conversion<br><br>Please provide photos of existing power arrangements <br><br>Please provide number of Grills

  • Are any new Grills being Installed<br>

  • What Model of Grill if known and will electric conversion be required for new 3 platen grill's

  • Prep Line will a new water line be required for steamers

  • Are New UHC HD units being installed<br>If yes will a USB update be required for programming

  • Is there a 3rd IP Station being installed<br>If yes please note approximate length of water line required and fittings<br>

  • Is there any fixed refrigeration to the Centre Island

  • Are existing Drinks towers being re used<br>Please add photos of existing Drinks towers and any notes that are relevant

  • Will existing pythons require extending<br>If yes please indicate approximate length and route<br>please add any additional information and photos you consider relevant

  • Will existing pythons require removal <br>If yes please indicate approximate length and route<br>please add any additional information and photos you consider relevant

  • If New Pythons are being installed please indicate approximate length and route<br>Please add any additional information and photos you consider relevant

  • Will any new or relocated equipment require16a plugs <br>(new hoods, chases only have 16a sockets)<br>If yes list equipment<br><br>please add any additional information and photos you consider relevant

  • Are existing coffee lines labelled accordingly?<br>(If NO please add any additional information you consider relevant)

  • Are existing coffee lines easy to isolate ?<br>( If NO please add any additional information you consider relevant)

  • Do any coffee lines require replacement<br><br>If yes please indicate approximate length and route<br>please add any additional information and photos you consider relevant

  • Do Britta / WMF filters require relocating?<br>(If yes please add any additional information you consider relevant)

  • Are existing coffee machines being refitted<br><br>

  • Are existing coffee machines being refitted If yes please identify which company will be re installing and identify if any faults with machines at time of survey

  • Are any additional water lines required for future or additional coffee machines

  • Will Blended Ice machine services require repositioning or removal during work,<br>If so will they require extending please give details below

  • Is a chilled water line required for the Blended Ice Machine<br>If yes please indicate approximate length of run to Drinks tower position

  • Will any other equipment with filtered water or Co2 / Air services require removal or repositioning<br>If yes give details below

  • Is Ice Machine being relocated<br>If yes note if new water line is required<br>Note if drain pipe work will need replacing and size and quantity required<br>Note Make and model of unit <br>Check unit is operational <br>Check date of last clean if possible

  • Will attending engineers require CSCS qualification?

  • Is the use of ladders permitted on site?<br>( if No podiums will be required) please add any additional information you consider relevant

  • Please determine who commissioning stock requests should be sent to and supply name , contact number & email address

  • Will electrical support be required from main contractor?<br>If yes please add any additional information you consider relevant

  • Will Portable Appliance Test (PAT) be required?

  • Portable Appliance test company

  • Any special requirements / further comments?<br>If yes please add any additional information you consider relevant

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.