Title Page
-
Document No.
-
EOTF Intrusive Survey Catering Equipment
-
Client / Site
-
Conducted on
-
Prepared by JAC Electrical Service UK Ltd
-
Personnel
-
Site name & Number
-
Select date
-
Site Drawings Received?<br>If no request a copy from Main Contractor
-
Does existing equipment require repair and/or replacement?<br>If yes please indicate<br>Make<br>Model<br>Serial<br>Further information regarding repair
-
Fry Station 1 APS Check if APS is present
- in chase
- in ceiling
- on Roof with extract duct
-
Fry Station 1 Gas Supplies Check for gas supplies to island please indicate location and any applicable photos
- yes Main contractor to arrange cap off and removal
- none to island
- NA
-
Fry Station 2 APS Check if APS is present
- in chase
- in ceiling
- on Roof with extract duct
-
Fry Station 2 Gas Supplies Check for gas supplies to island please indicate location and any applicable photos
- yes Main contractor to arrange cap off and removal
- none to island
- NA
-
CFP Station APS Check if APS is present
- in chase
- in ceiling
- on Roof with extract duct
-
CFP Gas Supplies Check for gas supplies to island please indicate location and any applicable photos
- yes Main contractor to arrange cap off and removal
- none to island
- NA
-
Grill Station APS Check if APS is present
- in chase
- in ceiling
- on Roof with extract duct
-
Grill island Gas Supplies Check for gas supplies to island please indicate location and any applicable photos
- yes Main contractor to arrange cap off and removal
- none to island
- NA
-
Is Grill hood being replaced
-
If yes will Grill(s) require 3 lead to single 7 pin appliance adaptor plug conversion<br><br>Please provide photos of existing power arrangements <br><br>Please provide number of Grills
-
Is there any refrigeration on the Grill / Centre island<br>If yes please add any additional information and photos you consider relevant <br>
-
Are existing Drinks towers being <br>please add any additional information and photos you consider relevant <br>
-
Will existing pythons require removal <br>If yes please indicate approximate length and route<br>please add any additional information and photos you consider relevant <br>
-
If new pythons are to be installed<br>please indicate approximate length and route<br>please add any additional information and photos you consider relevant
-
Will existing pythons require extending<br>If yes please indicate approximate length and route<br>please add any additional information and photos you consider relevant
-
Will any new or relocated equipment require16a plugs <br>(new hoods, chases only have 16a sockets)<br>If yes list equipment<br><br>please add any additional information and photos you consider relevant
-
Are existing coffee lines labelled accordingly?<br>(If NO please add any additional information you consider relevant)
-
Are existing coffee lines easy to isolate ?<br>( If NO please add any additional information you consider relevant)
-
Do any coffee lines require replacement<br><br>If yes please indicate approximate length and route<br>please add any additional information and photos you consider relevant
-
Do Britta / WMF filters require relocating?<br>(If yes please add any additional information you consider relevant)
-
Are existing coffee machines being refitted<br><br>
-
Are existing coffee machines being refitted If yes please identify which company will be re installing and identify if any faults with machines at time of survey
- Existing machines to be refitted by JAC Electrical
- WMF for new WMF machines only
- United coffee for new B&W machines only
-
Will Blended Ice machine services require repositioning or removal during work,<br>If so will they require extending please give details below
-
Will any other equipment with filtered water or Co2 / Air services require removal or repositioning<br>If yes give details below
-
Will attending engineers require CSCS qualification?
-
Is the use of ladders permitted on site?<br>( if No podiums will be required) please add any additional information you consider relevant
-
Please determine who commissioning stock requests should be sent to and supply name , contact number & email address
-
Will electrical support be required from main contractor?<br>If yes please add any additional information you consider relevant
-
Will Portable Appliance Test (PAT) be required?
-
Portable Appliance test company
- JAC Electrical Services
- Main contractors company
-
Any special requirements / further comments?<br>If yes please add any additional information you consider relevant
-
Add signature