Title Page

  • Conducted On:

  • Post Inspection Conducted By:

  • Document No.

Address, Client,

  • Address of the installation:
  • Date initial works complete:

  • Operatives Name

  • Works Carried Out

Visual Inspections:

  • Location Of Consumer Unit:

  • Photo of consumer unit

  • Safe Isolation procedure followed ?

  • Does the primary supply conductor information match the certificate?

  • Does the main earthing conductor information match the certificate?

  • Does the earthing system type match the certificate?

  • Are the main protective bonding conductors in place?

  • Are all accessories in an acceptable safe condition?

  • Is there a circuit schedule present at the consumer unit?

  • Are all suitable warning labels present?

  • Is the consumer unit's enclosure satisfactory in terms of IP rating?

  • Does the circuit layout match the certificate's circuit schedule?

  • Are all circuit breakers of a suitable type and rating?

  • Are all terminations/connections within the consumer unit tight and secure?

Testing and Inspections:

  • Is the measured Ze of an acceptable reading for the type of earthing system?

  • Is the PFC of an acceptable measurement for overcurrent protective device(s) rating(s)?

  • Are the RCD(s) operational and do trip times conform?

  • Are ring main conductors end to end measurements of an acceptable reading?

  • Do ring main end to end measurements match that off the certificate?

  • Do R1 + R2 continuity measurements match that of the certificate?

  • Do all (sampled) Zs measurements conform to maximum permissible?

Observations & recommendations:

  • Has all the C1's & C2's been rectified as clients instructions?

  • Has all the C3's been recored on the certificate correctly?

  • Is the operatives summary on the condition report true and accurate?

Variations / Booked Works:

  • Do the works completed by the operative match what has been carried out?

Photographs:

  • Is there a photograph of the supply characteristics and earthing arrangements attached to the certificate?

  • Is there a photograph of the circuit schedule label attached to the consumer unit attached to the certificate?

  • Is there photographic evidence of completed works attached to the certificate?

Tenant:

  • Is the tenant happy with the works completed?

  • Was the tenant made aware of the works completed by the electrician?

  • Summary

  • Are works to a Satisfactory standard ?

  • Comments

Post Inspection Information:

  • Post inspection completed by:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.