Title Page
-
Conducted On:
-
Post Inspection Conducted By:
-
Document No.
Address, Client,
-
Address of the installation:N
-
Date initial works complete:
-
Operatives Name
- Jo Chapman
- Andrew Gwilliam
- Braden Taylor
- Chris Baikie
- Chris Mason
- Claire Fairweather
- Dan Gipp
- David Lumbard
- Grant Wilson
- Neil Smith
- Nick Seppings
- Jack Ansell
- Shaun Ives
- Ross Fairweather
- Sam Smith
- Darren Hamilton
- Sub contractor
-
Works Carried Out
- Full Rewire
- Upgrade
- Replacement Consumer Unit
- New Circuit
- EICR
- Minor Works
- Communal Lighting
- Smoke Alarm
- Emergency Light Replacement
- Storage Heater Install
Visual Inspections:
-
Location Of Consumer Unit:
-
Photo of consumer unit
-
Safe Isolation procedure followed ?
-
Does the primary supply conductor information match the certificate?
-
Does the main earthing conductor information match the certificate?
-
Does the earthing system type match the certificate?
-
Are the main protective bonding conductors in place?
-
Are all accessories in an acceptable safe condition?
-
Is there a circuit schedule present at the consumer unit?
-
Are all suitable warning labels present?
-
Is the consumer unit's enclosure satisfactory in terms of IP rating?
-
Does the circuit layout match the certificate's circuit schedule?
-
Are all circuit breakers of a suitable type and rating?
-
Are all terminations/connections within the consumer unit tight and secure?
Observations & recommendations:
-
Has all the C1's & C2's been rectified as clients instructions?
-
Has all the C3's been recored on the certificate correctly?
-
Is the operatives summary on the condition report true and accurate?
Variations / Booked Works:
-
Do the works completed by the operative match what has been carried out?
Photographs:
-
Is there a photograph of the supply characteristics and earthing arrangements attached to the certificate?
-
Is there a photograph of the circuit schedule label attached to the consumer unit attached to the certificate?
-
Is there photographic evidence of completed works attached to the certificate?
Tenant:
-
Is the tenant happy with the works completed?
-
Was the tenant made aware of the works completed by the electrician?
-
Summary
-
Are works to a Satisfactory standard ?
- Compliant
- Non Compliant
- Poor
- Good
- High Standard
-
Comments
-
undefined
Post Inspection Information:
-
Post inspection completed by: