Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Electrical Prestart

  • Have all relevant Tickets/Licences been sighted and are current?

  • Traffic Controllers carrying Traffic Control licence on their person?

  • What Did We Do Well Yesterday? Did Anyone Notice Anything Unsafe? Near Miss?

  • Latest Safety Alerts – Could That Happen To Us?

  • Latest ‘RoadTek Weekly Safety Incidents’ email for discussion.

  • Toolbox Talk Today

  • Welfare Facilities, consultation with workers ?

  • Emergency Evacuation Point - Primary and Secondary

  • Client onsite and any instruction received

  • What instructions were received ?

  • Expected Weather Conditions Today?

  • What’s Happening Today?

  • Subcontractors on site

  • Traffic Control Company?

  • Plant and Equipment Company/s?

High Risk Activities

    Specific Activities and Assigned Responsibilities
  • Assigned responsibility and who is doing it?

  • Is an Electrical Isolation and Reconnection Certificate Needed?

  • What High Risk Construction Activities Are We Undertaking Today

  • What other high risk activities ?

  • Risk Assessments

  • Works Procedures

  • TGS

  • Clear passage for pedestrians ?

  • Detail plant movement requirements ?

  • Has all plant on site had relevant operator's checklist completed ?

  • Overhead powerlines

  • Powerline permit attached?

  • Hazards and Risks on site
  • Risks and Controls implemented to reduce risks

Do you have mobile plant on site

  • Who is the stopper

Emergency energised electrical work

  • If energised electrical work is necessary, state the reason for energised work

  • Denote/indicate specific work activities as per RA WOONEEE

  • Risk Assessment Result

  • Required Arc Flash PPE Rating

  • Site UHF

PPE and Environmental/Quality

  • PPE Checklist

  • What other PPE is required?

  • Are there any Environmental or Quality Issues ?

  • What environmental or quality issues are there on site ?

Prestart Attendance

  • Other Issues?
    o Discuss hazards associated with design / scope change.
    o Is there any work that requires use of ladders? Have alternative methods been investigated and risk
    assessment carried out
    o Daily plant movement and expected changes
    o Safety requirements for the unloading of delivery trucks

  • Important Numbers (to be read out/reinforced during each prestart)

  • WHS Connect (7am-5pm Mon-Fri) - reporting incidents - 1800 867 947 (1800 TMR WHS)

  • Roadworker Safety Hotline (24hrs) - reporting poor driving behaviour - 1800 501 509

  • By signing below, I acknowledge that I am fit for work and understand all information presented in this pre-start

  • Add attendee
  • Full name of attendee

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.