Site Pre Start Risk Assessment
-
This checklist is used to help identify site hazards in conjunction with your safe work method statement (SWMS). All workers in your team and work zone must be consulted on how you will manage the identified hazards. If you do not have one prepared for this site there are templates linked to the trades types/task section that you may use to make your own.
-
Name of business entity in control of the site
-
Site Supervisor name and contact number
-
Site Address
-
Conducted on
-
Prepared by
Trades
-
Please select what trade you are, or work type you are authorised to conduct on site from the drop down list below.
- Electrical Underground
- Electrical Power Board Installation
- Electrical Rough-in
- Electrical Fit Off
- Electrical Fault Finding
-
Please read and review the following safe work method statement. (Temp Fence Installation)
https://drive.google.com/drive/u/4/folders/1bzgzfTgBPfgWNdCTfWjywVLkrNX9qJgU -
Please read and review the following safe work method statement. (Temp Fence Installation)
https://drive.google.com/drive/u/0/folders/1nRrEDbjnnZ9yCKvrfi59m1m5Amv5eBRj -
Please read and review the following safe work method statement. (Electrical Rough in)
https://drive.google.com/drive/u/0/folders/1b0_J01h_eU2iqXIkTmy5_Kpn0fJ-Tkdl -
Please read and review the following safe work method statement. (Plumber Drainer)
https://drive.google.com/drive/u/4/folders/11CHNBMPKa2rV9EJKiSSCk84YtIdf1iPk -
Please read and review the following safe work method statement. (Electrical Services Underground)
https://drive.google.com/drive/u/4/folders/1iKwEXZuKScfLo12r5rjNq0JuKpXr3PXm -
I have read the applicable SWMS all of my team have been inducted into the applicable SWMS for the activities to be conducted, I have engaged other trades/persons on site and reviewed each others activities and taken that into account as part of completed the following hazard assessment.
HAZARDS. Identify the hazards that will hurt you on site.
-
Select the hazards that can possibly hurt you on site from the following drop down.
- Team member/s may not be fit to work
- Rain/Winds/Heat
- Gas leak detected
- unsure of requirements or process
- Potential Live Sevices underground/ovehead
- Traffic Hazards
- Amenities in poor condition
- Unauthorised Entry of people to site
- obstructed site access
- mud control required on site
- open trenches or holes
- Asbestos Containing Material
- Objects that pose a cut hazard
- Fall zones
- material drop from height
- Working over the top of people
- incomplete/unsafe scaffold
- Awkward or difficult lifts
- unstable surface
- interaction with plant equipment
- Live electrical circuits
- Over head powerlines
- Leaking Gas LIne
- Capped Gas Line
- Permits required for task
- pressurised gas/air used
- Chemicals/paints/sealants used
- Other
-
Please describe the hazard
-
Take a photo of the hazards
ACTIONS. Confirm the action you will take to manage the identified hazards
-
Select the actions from the drop down list that you will implement as part of your control measure in your SWMS
- Isolate area
- Drop Zone barricaded
- Clear access path
- barricade fall zone
- raise electrical leads
- progressive house keeping
- Do not use scaffold
- Euipment check prior to start
- Contact supervisors for direction
- Ensure spotter is in Place
- Loading zone is braced and propped
- Clean access/work zone
- Clean amenities
- Plank out access path
- Secure site
- engage with other trades on site
- Toolbox with team
- Dial before you dig
- Shoring or Batter
- Cover/Barricade Trench
- Turn off gas supply
- Isolate electrical circuit
- Team lift
- Mechanical Lift
- Isolate people from work zone
- Ensure correct PPE is used
- Do not work on roof
- Implement heat plan
- clean public access areas eg: footpath/nature strip/road
- Traffic management in place
- Request further information
- Team fit for task
- Contact Supervisor & Leave site
- Line Pump to be used
- Franner Crane to be used
- Permits in place
- Check all Viod Platforms
- Access Ladders Secured
- Gate access used
- Brick elevator used
- Safety Data Sheets reviewed
- Other
-
Please write down the hazard control method that you will use.
-
I acknowledge and understand the safe work method statement and site risk assessment. I am the person responsible to implement or change the SWMS in accordance with the work.
-
Worker on site sign off:
-
Worker on site sign off:
-
Worker on site sign off:
-
Worker on site sign off:
-
Worker on site sign off:
Site/Job Supervisor SWMS review sign off
-
The site/job supervisor should review the SWMS when available, for the purposes of identifying hazards that may be present on site that are not within the reasonable skill set of the contractor completing the swms for the task. If the Supervisor is not on site please, check the builders sign or site information notice board for specific site hazards, if unsure call to check for any specific hazards.
-
Site/Job supervisor name