Information

  • Document No.

  • Contractor name:

  • ConSol number (D&C)

  • Date / Time of Review

  • Site Location

  • Location
  • Emergency Assembly Area:

  • Photo of site before work commences

HAZARDS

  • Hazards identified as "Yes" are to have a control measure documented.

DOCUMENTATION

  • Has a Safe Work Method Statement been developed?

  • Control measure if "Yes".

  • All workers inducted into Safe Work Method Statement (SWMS)?

  • Control measure if "Yes".

Traffic Management

  • Pedestrian Management Assessed

  • Control measure if "Yes".

  • Traffic Managed

  • Control measure if "Yes".

Plant

  • Plant / Equipment ay work site

  • Control measure if "Yes".

  • EWP utilised

  • Control measure if "Yes".

  • Underground assets (gas, water, power, communications)

  • Control measure if "Yes".

  • Overhead electrical hazards

  • Control measure if "Yes".

  • Excavations or trenches

  • Control measure if "Yes".

Climate Conditions

  • Weather conditions suitable - (heat, cold, rain)

  • Control measure if "Yes".

  • Light sufficient for all tasks

  • Control measure if "Yes".

  • Direct sunlight exposure

  • Control measure if "Yes".

Site Conditions

  • Presence of potentially dangerous animals and fauna (including dogs, snakes and insects)

  • Control measure if "Yes".

  • Biological hazards (syringes, contaminated water)

  • Control measure if "Yes".

  • Use of hazardous substances and/or dangerous goods

  • Control measure if "Yes".

  • Asbestos (ACM) materials

  • Control measure if "Yes".

  • Work at heights tasks

  • Control measure if "Yes".

  • Electrical hazards

  • Control measure if "Yes".

  • Confined spaces

  • Control measure if "Yes".

  • Ground surfaces, risk of trips and falls

  • Control measure if "Yes".

  • Ignition sources

  • Control measure if "Yes".

Manual Handling

  • Awkward postures

  • Control measure if "Yes".

  • Lifting, lowering or sudden body movement

  • Control measure if "Yes".

  • Pushing or pulling

  • Control measure if "Yes".

  • Sustained vibration

  • Control measure if "Yes".

Environmental Hazards

  • Contaminated soil and water

  • Storm water or sediment control

  • Dewatering

  • Air quality

  • Dust emissions

  • Disturbance to flora and fauna

  • Noise and vibrations

  • Waste disposal from site

  • Spreading of weeds and pests

  • Cultural Heritage and Archaeology

  • Fire including brushfire prevention

DETAILS OF ADDITIONAL HAZARDS IDENTIFIED AND SUBSEQUENT CONTROLS IMPLEMENTED

  • Additional hazards and controls

Sign Off

  • Worker's Name

  • Worker's Name

  • Worker's Name

  • Worker's Name

  • Worker's Name

  • Worker's Name

  • Worker's Name

  • Worker's Name

  • Worker's Name

  • Worker's Name

  • Visitor's Name

  • Visitor's Name

  • Visitor's Name

  • Version number: draft 1. Date: 15 Jan 2013

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.