Information
-
Document No.
-
Contractor name:
-
ConSol number (D&C) / AGS number (I&M)
-
Review Number: (Allocated from Site Action Tracking Register)
-
Contractor Site Representative:
-
Project (select one)
-
Date / Time of Review
-
Site Location
-
Location
-
Stage of Works
-
Description of Works being undertaken
-
Scope of Observation (ALL Topics or list the number of the Topics included in Observation) 1.0 Documentation(mandatory), 2.0 Plant (mandatory), 3.0 Traffic/Pedestrian Management (mandatory), 4.0 PPE (mandatory), 5.0 Tools and Equipment (mandatory), 6.0 Work Practices (mandatory), 7.0 Electrical Equipment (mandatory), 8.0 Pole / Confined Space Equipment (mandatory), 9.0 Vehicle Inspection, 10.0 Asbestos Removal, 11.0 Hot Work, 12.0 Excavation, 13.0 Licences, 14.0 Emergency Equipment, 15.0 Refuelling Equipment, 16.0 Working From Heights, 17.0 Environmental
-
Reviewer name
1.0 DOCUMENTATION (mandatory to review)
-
1.1. Reviewer Inducted to Site?
-
1.2. Safe Work Method Statement (SWMS) on site?
-
1.3. SWSM Signed?
-
1.4. Job Safety and Environmental Analysis (JSEA) completed?
-
1.5. All site hazards identified in JSEA and controls in place for hazards?
-
1.6. All workers / visitors signed JSEA?
-
1.7. THL identified (TM advised or tag/sticker present)?
-
1.8. Safety Data Sheets (SDS) on site?
-
1.9. SDS current (less than 5 years old)?
-
1.10. Traffic Management Plans on site?
-
1.11. Dial Before You Dig (DBYD) documents obtained?
-
Photo of DBYD document
-
1.12. Emergency Plans in place?
-
1.13. Emergency contact numbers available?
2.0 PLANT (mandatory to review)
-
2.1 Plant Registered (Full or Conditional)?
-
Photo of plant
-
2.2. Daily Pre Start check list completed?
-
2.3. Maintenance books on hand?
-
2.4. Operating rotating beacon / light?
-
2.5. Rear reflectors installed?
-
2.6. Rear vision mirrors in good condition?
-
2.7. Horn operates?
-
2.8. Audible reversing alarm?
-
2.9. Roll Over Protection (ROPS) installed?
-
2.10. Fall Out Protection (FOPS) installed?
-
2.11. Seat belt installed and used?
-
2.12. Plant and work site at end of day securely locked down?
-
2.13. Correct barricading used? Appropriate for work?
3.0 TRAFFIC MANAGEMENT (mandatory to review)
-
Photo of worksite
-
3.1. Pedestrian Signage available / used?
-
3.2. Witches hats available / used around vehicle(s)?
-
3.3. Vehicles protected with barricades?
-
3.4. Access cleared for pedestrians?
-
3.5. No equipment / cables / ropes / cords obstruct pedestrian pathway?
-
3.6. Traffic sign - worker ahead used?
-
3.7. Traffic control required / used?
-
3.8. Traffic controller certified?
4.0 PERSONAL PROTECTIVE EQUIPMENT (PPE) (mandatory to review)
-
4.1 Safety helmet in date?
-
Helmet manufacture date (must be less than three years)
-
4.2. Wide brimmed hat used?
-
4.3. Safety boots (steel capped) worn?
-
4.4 High visibility clothing worn?
-
4.5. Long sleeved cotton high-visibility shirt worn for electrical work?
-
4.6. Pole PPE used (cotton long trousers, shirt or overalls)?
-
4.7. Safety glasses (AS approved) used?
-
4.8. Hearing protection available / used?
-
4.9. Riggers gloves available?
-
4.10. LV Rubber gloves (650V) - Date stamped 12 months?
-
4.11. Rubber Mat Electrical 650V available?
5.0 TOOLS AND EQUIPMENT (mandatory to review)
-
5.1. Manhole key available / used?
-
5.2. Pit seal breaker available / used?
-
5.3. Extension ladder - fibreglass?
-
5.4. Step ladder -fibreglass?
-
5.5. LPG gas cylinder with regulator?
-
5.6. Wooden /fibreglass handle crowbar?
-
5.7. Wooden / fibreglass handle shovel?
-
5.8. Gas detector calibrated?
-
Date calibration due?
6.0 WORK PRACTICES (mandatory to review)
-
6.1. Vehicles / plant correctly parked and guarded?
-
6.2. Work area properly guarded?
-
6.3. All equipment (including covers / lids) within guarded site?
-
6.4. Work area clear of obstacles?
-
6.5. Power cables not lying on /across ground?
-
6.6 Adequate lighting in place (night work)?
7.0 ELECTRICAL EQUIPMENT (mandatory to review)
-
7.1. Portable power tools used?
-
7.2. Electrical power tools tested and tagged (every 3 months)?
-
Due for re-testing and tagging
-
7.3. RCD unit used with electrical power tools?
-
7.4. RCD unit tested (every 3 months)?
-
Due for re-testing
-
7.5. Lock out tags available?
8.0 POLE / CONFINED SPACE EQUIPMENT (mandatory to review)
-
8.1. Full body harness (in date)?
-
Date of expiry
-
8.2. Pole strap (in date)?
-
Date of expiry
-
8.3. Safety rope available?
-
8.4. Tripod available? (Confined space work only)
9.0 VEHICLE INSPECTION
-
9.1. Registration current?
-
Registration number(s) of vehicles on site?
-
9.2. Windscreen - no cracks/ chips?
-
9.3. Cargo barrier installed?
-
9.4. Sufficient storage?
-
9.5. Vehicle in good condition, free from damage?
-
9.6. Ladder racks?
-
9.7. Conduit carrier with end caps?
-
9.8. Vented gas storage facility?
10.0 ASBESTOS REMOVAL
-
10.1. Area appropriately barricaded?
-
10.2. Asbestos signage erected?
-
10.3. Appropriate PPE used (disposable suit, gloves, P2 mask, glasses, non-laced boots)?
-
10.4. Workers clear of area during asbestos removal?
-
10.5. Asbestos bags used for ACM?
-
10.6. Hand tools used to break up ACM?
-
10.7. Tools washed down upon completion of ACM removal?
-
10.8. Asbestos bags sealed and marked correctly? (Including hours in Victoria)
11.0 HOT WORK
-
11.1. Hot work permit issued?
-
11.2. Fire extinguisher located near hot works?
-
11.3. Hot work not undertaken on extreme weather days (i.e. excessive temperatures)?
12.0 EXCAVATION
-
12.1. Trench barricaded?
-
Photo of trench and barricade
-
12.2. Spotter used with excavator?
-
12.3. Spotter has no other duties?
-
12.4. Spoil placed 1 metre from trench?
-
12.5. Where possible spoil placed away from road / gutter side of trench?
-
12.6. Socks placed in gutter before storm water drains?
-
Photo of storm water drain and protection
13.0 LICENCES
-
13.1. Workers have Construction Induction Cards?
-
13.2. All drivers have current vehicle drivers licences?
-
13.3. ISGM ID cards (I&M staff only) letter (D&C contractors)?
-
13.4. Plant operator licensed / certificate of competency?
-
13.5. Confined Space trained when entering confined spaces?
-
13.6. Working at Heights training when climbing poles?
14.0 EMERGENCY EQUIPMENT
-
14.1. First Aid Kit (meets Code of Practice)?
-
14.2. Signage on vehicle (first aid and fire extinguisher)?
-
14.3. First Aid Kit stock within labelled date (bandages and eye wash)?
-
14.4. Fire blanket available?
-
14.5. Fire extinguisher (at least 2kg) available?
-
14.6 Sharps kit available?
-
14.7. Spill kit available on site?
15.0 REFUELLING PLANT AND EQUIPMENT
-
15.1. Safety Data Sheet held for fuel?
-
15.2. Refuelling undertaken in open space?
-
15.3. Spill kit available when refuelling?
-
15.4. Fire extinguisher placed near refuelling location?
-
15.5. No naked flames in refuelling area?
16.0 WORKING AT HEIGHTS
-
16.1. Industrial fibreglass ladder used?
-
16.2. Ladder at 1:4 incline?
-
16.3. Ladder secured to pole?
-
16.4. Three (3) points of contact used to ascend/ descend ladder?
-
16.5. Pole bag / tool belt used for tools?
-
16.6. EWP operating on level ground?
17.0 ENVIRONMENTAL
-
17.1. Work site neat and tidy?
-
17.2. Work site not contaminated?
-
17.3. Soil erosion controlled?
-
17.4. Sediment controlled?
-
17.5. Silt / sediment fence installed?
-
17.6. Waste water managed?
-
17.7. Dewatering controlled / managed?
-
17.8. Noise controlled / minimised?
-
17.9. Handling and disposal of asbestos managed?
-
17.10. Air quality controlled (i.e. dust wet down)?
-
17.11. Stockpiling of soil managed?
-
17.12. Site reinstatement managed?
-
17.13. Acid sulphate soils controlled?
-
17.14. Vibration monitored around buildings?
-
17.15. Flora and Fauna protection controlled and managed?
-
17.16. Weed control managed?
-
17.17. Cultural and Heritage areas identified, controlled and managed?
-
17.18. Plant /vehicle wash down controlled and managed?
BRIEF DESCRIPTION OF NON CONFORMANCE ISSUES
-
NON CONFORMANCE ISSUE 1.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 2.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 3.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 4.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 5.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 6.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 7.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 8.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 9.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 10.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 11.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 12.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 13.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 14.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 15.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 16.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 17.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 18.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 19.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
-
NON CONFORMANCE ISSUE 20.0
- Attended to during review
- Immediately
- 5 days
- 14 days
- 30 days
OTHER OBSERVATIONS AND ADDITIONAL NOTES
Sign Off
-
On site representative's signature
-
Reviewer's signature
-
Regional Contract Manager signature
-
Version number: draft 5. Date: 7Jan 2013