Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Personnel Present:
Project Information
-
Hospital Name:
-
Hospital Address:
-
Address Pin:
-
Bunker Name:
-
Serial Number:
-
Primary Hospital Contact:
-
Additional Hospital Contacts (if Applicable):
-
Additional Hospital Contacts (if Applicable):
-
Elekta Project Contacts:
-
Logistic Lead:
-
Site Coordinator:
-
Project Manager:
-
Installation Lead Project Engineer:
-
Field Service Engineer:
-
K&N Project Contact:
-
Rigging Company:
-
Rigging Company Contacts:
-
Site Survey #1 Date:
-
Site Survey #2 Date:
-
Additional Survey Dates:
Delivery Information
-
Equipment to be delivered - Refer to rigging document for details of components and rigging methods.
Delivery 1 - Pre installation kit, cables and cabinets
Delivery 2 - Gantry
Delivery 3 - Gantry Components
Delivery 4 - Magnet
Delivery 5 - RF Cage structure
Delivery 6 - RF Cage Inner finishes
Delivery 7 - Covers and PSS -
Select Delivery #
- Delivery #1
- Delivery #2
- Delivery #3
- Delivery #4
- Delivery #5
- Delivery #6
- Delivery #7
- Delivery #8
- Delivery #9
-
Enter start Date & Time:
-
Enter Finish Date & Time:
-
Enter Route:
-
Pictures of Route:
-
Type of vehicle:
-
Number of Riggers:
-
Additional Information:
Delivery Route #1 (Large Components)
-
Delivery Route #1: (Large Components)
-
External Site Access:
-
Height Restrictions:
-
Weight Restrictions:
-
Parking Restrictions:
-
Road Closers:
-
Restricted Working Hours:
-
Special External Requirements:
-
Off Loading Method:
-
Note: If applicable include a copy of the crane lifting plan and survey drawings.
-
Tail Lift
-
Fork Lift
-
Crane
-
Barriers / Signage:
-
Special Off Loading Requirements:
-
Internal Site Access:
-
Platform or Ramp Required:
-
Floor Protection:
-
Enabling Building Works:
-
Bunker Access:
-
Special Access Requirements:
-
Additional Customer Requirements / Considerations:
-
List of tools and Tackle:
-
Document Route (including pictures where possible)
Delivery Route #2 (Standard Items)
-
Delivery Route #2: (Standard Items)
-
External Site Access:
-
Height Restrictions:
-
Weight Restrictions:
-
Parking Restrictions:
-
Road Closers:
-
Restricted Working Hours:
-
Special External Requirements:
-
Off Loading Method:
-
Note: If applicable include a copy of the crane lifting plan and survey drawings.
-
Tail Lift
-
Fork Lift
-
Crane
-
Barriers / Signage:
-
Special Off Loading Requirements:
-
Internal Site Access:
-
Platform or Ramp Required:
-
Floor Protection:
-
Enabling Building Works:
-
Bunker Access:
-
Special Access Requirements:
Required Tackle to be supplied
-
General Tackle (Enter Quantity & Delivery #)
-
Pallet Truck:
-
Rollers:
-
Scoots:
-
Skates:
-
Power Climber:
-
Stair Climber:
-
Sleepers:
-
Deals:
-
Roller Crowbar:
-
Skateboard:
-
Pallets:
-
Shims:
-
Blocks:
-
Aluminum Plates:
-
Hardboard:
-
Plywood Sheets:
-
Alignment Tool:
-
Hilti Drill:
-
Chop Saw:
-
Tool Chest:
-
Sack Truck:
-
Road Cones / Barriers:
-
Warning Signs:
-
Ladders:
-
Dust Sheets:
-
Vacuum Cleaner:
-
Lifting Tackle (Enter Quantity & Delivery #)
-
Jacks - 5 Ton:
-
Jacks - 10 ton:
-
Stacker:
-
Genie Lift:
-
Fork Lift:
-
Gantry:
-
Block & Tackle:
-
Girder Trolley:
-
Shackles:
-
Eye Bolts:
-
Slings:
-
Tirfor Winch:
-
Crane:
-
Scaffold Tower:
-
Specialised Equipment as per Tackle Van (Enter Quantity & Delivery #)
-
Master Mover:
-
Air Pads:
-
Fork Lift Extensions:
-
Magnet Lifting Beam:
-
Magnet Lifting Wheels:
-
Personal Protection Equipment: (Enter Quantity & Delivery #)
-
Hard Hats:
-
Luminous Jackets:
-
Eye Protection:
-
Safety Harnesses:
-
Radios:
-
Footwear:
-
Gloves:
-
Notes:
Required Items Check Sheet
-
General Tackle:
-
Pallet Truck:
-
Rollers:
-
Scoots:
-
Skates:
-
Power Climber:
-
Stair Climber:
-
Sleepers:
-
Deals:
-
Roller Crowbar:
-
Skateboards:
-
Pallets:
-
Shims:
-
Blocks:
-
Aluminum Plates:
-
Hardboard:
-
Plywood Sheets:
-
Alignment Tool:
-
Hilti Drill:
-
Chop Saw:
-
Tool Chest:
-
Sack Truck:
-
Road Cones / Barriers:
-
Warning Signs:
-
Ladders:
-
Dust Sheets:
-
Vacuum Cleaner: