Title Page

  • Occupancy Name

  • Physical building address

  • Main Phone Number

Pre Plan Information

    Key Holders
  • Name

  • Phone Number

  • E-Mail

Building Construction

  • Building Construction Type

  • Stories above ground?

  • Does this structure have a basement?

  • Building Length (ft)

  • Building Width (ft)

  • Building Size (Sq.Ft)

  • Are there stairs in the building?

  • Location

  • Is there an elevator in the building?

  • Location

  • Are there any fire walls in the building?

  • Location

Occupancy

  • Occupancy Type

  • Special Evacuation Needs

  • Primary Hours of Operation

  • Typical Daytime Occupancy

  • Typical Nighttime Occupancy

  • Are there exposures to be considered

  • What are the exposures and their locations

Access

  • Is there a Knox box?

  • Location

  • Is there a main access point?

  • Location

  • Any concerns gaining access

  • Explain Concerns

  • Are there additional access points?

  • Explain locations

  • Is there exterior roof access?

  • Location

  • Is there interior roof access?

  • Location

Utilities

  • Is there electrical service present?

  • Disconnect Location

  • Natural Gas Present

  • Valve Location

  • Propane Present

  • Tank Location

  • Municipal Water Present

  • Shut Off Location

  • Is there a generator present?

  • Generator location?

  • Solar Power Present

  • Disconnect Location

Fire Protection

  • Fire Alarm System

  • Panel Location

  • Sprinkler System

  • Main Control Location

  • Fire Department Connection

  • Location

  • Fire Pump

  • Location

  • Fire Protection System

  • Type of Fire Protection System

  • Type Description

  • Special Extinguishing Agent

  • Type

  • Amount

Water Supply

  • Water Supply

  • Closest Fill Site

  • Backup Fill Site

  • Hydrant Location

  • Needed Fire Flow 25% Involved (gpm)

  • (Length x Width) / 3 x number of floors = Fire Flow. Fire Flow x.25 gets 25% needed

  • Needed Fire Flow 50% Involved (gpm)

  • (Length x Width) / 3 x number of floors = Fire Flow. Fire Flow x.5 gets 25% needed

  • Needed Fire Flow 75% Involved (gpm)

  • (Length x Width) / 3 x number of floors = Fire Flow. Fire Flow x.75 gets 25% needed

  • Needed Fire Flow 100% Involved (gpm)

  • (Length x Width) / 3 x number of floors = Fire Flow

  • Hazardous Materials Present
  • Hazardous Materials Present

  • Chemical Name / UN

  • Water Reactive

  • Amount

  • Location

MABAS

  • MABAS Card

  • Will equipment staging be needed?

  • Staging locations

  • Special Call

  • Resource

NOTES

  • Additional Notes

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.