Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Type of emergency scenario to be portrayed:

1.0 General

  • 1.1 If using outside agency in the drill were they notified before hand and did they respond in a reasonable time?

  • 1.2 Was level of command followed and incident leader identified either formally or informally?

  • 1.3 Was an appropriate plan in place for the emergency scenario that was portrayed?

  • 1.4 Does staff seem to be oriented to the emergency plan?

  • 1.5 Did the event increase awareness and response to emergency scenarios?

  • 1.6 Were employee complaints and suggestions gathered as feedback and then addressed?

2.0 Alarm Function

  • 2.1 was the alarm heard in all areas of the site?

  • 2.2 is the sound of the alarm distinctive to other noises on site?

  • 2.3 Was the alarm functional - no delays starting it and it stays on for an appropriate length of time?

3.0 Evacuation

  • 3.1 Did all employees react to the alarm in an appropriate manor and evacuate in an orderly fashion?

  • 3.2 Was the evacuation prompt?

  • 3.3 was evacuation complete (all areas checked)

  • 3.4 appropriate routes for evacuation identified and followed?

  • 3.5 Alternate evacuation routes identified and used?

  • 3.6 Emergency exits are accessible and not blocked?

  • 3.7 Traffic flow adequate and well planned?

4.0 Role-call

  • 4.1 supervisors/managers fulfil assigned roles adequately?

  • 4.2 All employees in appropriate groups?

  • 4.3 All visitors are accounted for?

  • 4.4 Staff not at role-call accounted for?

  • 4.5 Role-call completed in a timely manor?

  • 4.6 Employees remain in the assembly area until the all clear signal is given?

  • 4.7 Role-call is documented?

5.0 Emergency Response Team (ERT)

  • 5.1 Communication is adequate?

  • 5.2 Response time was adequate?

  • 5.3 Roles and responsibilities reasonably fulfilled?

  • 5.4 Areas and equipment (plant) checked per plan?

  • 5.5 Emergency drill assessed by ERT and management?

6.0 Rescue

  • 6.1 Need for rescue is assessed quickly and area checked for additional hazards before beginning rescue?

  • 6.2 Appropriate rescue equipment available for the type of rescue being performed?

  • 6.3 Need for outside resources recognised in an acceptable time frame?

  • 6.4 Rescue techniques used are appropriate for the scenario being ran?

  • 6.5 Does rescue plan seem adequate and take into account contingency plans?

7.0 Training and Preparedness

  • 7.1 Employees knew their roles and responsibilities and acted accordingly?

  • 7.2 Shutdown duties carried out? (Plant and equipment, office fixtures, etc)

  • 7.3 Visitors escorted by employees?

8.0 Additional Information

  • 8.1 Weather conditions:

  • 8.2 What went well?

  • 8.3 What problems were encountered?

  • 8.4 What opportunities for improvement are there?

Acceptance

  • Sr Project Manager Fonterra

  • Project Manager LCI

  • HSE Manager LCI

  • HSE Officer Teamworkx

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.