Title Page

  • Conducted on

  • Prepared by

  • Project Name

Administration

  • IBC signage and logo presentation is acceptable including on temporary fencing and hoarding

  • Safety Signage posted at Site entry, Amenities and in work areas

  • IBC OHS policies and site notice board are correctly displayed

  • Safety information, names of safety rep, If You Are Injury information in prominent positions

  • Project HIRAC and EAP available on site and is it being reviewed monthly

  • IBC SWMS and safe work procedures are site specific, recorded and up to date

  • Site Supervisor SWMS Review Documentarian complete

  • General Construction Industry Induction and Site specific induction of all workers recorded

  • All site personnel health records up to date eg. diabetes, epilepsy etc

  • IBC Permit to work register up to date

  • Daily Pre Start meetings up to date

  • Regular OHS Safety toolbox meetings conducted and records complete

  • Weekly Site Safety Walk is up to date, toolboxed to site and minutes displayed in site amenities

  • Weekly Site HSEQ Checklist complete

  • Any incident need to be evaluated and actioned

Emergency Response

  • Project start up Emergency/ Evacuation drill complete as required within one month of the project start date

  • Regular 6 monthly Emergency/ evacuation response drill complete

  • Drill Report Form reviewed and corrective actions closed

  • Emergency stations are compliant (air horns, bleed kit, fire extinguisher, emergency information)

  • Emergency lighting is checked monthly including a discharge test every 6 months

  • Ingress and egress lighting suitable for use

  • Exit doors/ paths are clear, well lit and unobstructed

  • Evacuation assembly point identified

First Aid Facilities

  • First Aid room is setup according to the details in the First Aid and Emergency Assessment Checklist

  • Confirm emergency equipment is setup in accordance with the First Aid and Emergency Assessment checklist

  • First Aid kits are labelled are accessible, signage shows correct location

  • First Aid procedures in place

  • Correct names and contact details of First Aiders displayed

  • Review of the First Aid and Emergency Assessment Checklist is complete

Fire fighting equipment

  • Correct type and quantity of fire extinguishers

  • Fire extinguishers visually inspected and serviced every 6 months

Amenities

  • Meals/ dining area adequate and maintained

  • Toilets and washing facilities adequate and maintained

  • Clean drinking water available

Floors and walkways

  • Site entry, access and egress kept clear and well lit

  • Walkways and passageways clearly marked, unobstructed and well lit

  • Walkways clear of tripping hazards and obstructions (leads, hoses, etc.)

Electrical

  • Fixed RCD’s and over current protection provided to all switchboards and all site power

  • Fixed RCD’s monthly operating time testing complete (tripping current and testing time)

  • Portable RCD’s monthly operating time testing complete (tripping current and testing time)

  • 6 monthly retest and inspection of construction wiring supply to site

  • Power tools, extension leads and appliances in good condition with regular 3 monthly testing and tagging

  • All temporary leads are elevated off floor using lead stands/ insulated hooks

Lighting

  • All temporary lighting operating in all places required

Traffic Management

  • Is there a Traffic Management Plan for the project

  • Is the TMP adequate for the project with no damage to setup

  • IBC Traffic SWMS complete and sign

  • External TMP is still accurate

  • Internal TMP is still accurate

Subcontractor Management

  • Subcontractor induction and SWMS review complete prior to work commencing

  • Subcontractors sage operating procedures and SWMS sign in complete

  • Is Subcontractor supervision adequate

Personal Protective Equipment

  • Adequate PPE supplied with training and use procedures in place and followed

  • Correct PPE being used for the type of hazards

Manual Handling and Mechanical Aids

  • IBC Manual Handling SWMS complete and signed

  • Hazards identified and risks assessed

  • Training provided about risks and the proper techniques to undertake the task

  • Lifting and handling aids provided and maintained where possible (forklift, bin lifter, pallet trolley etc)

Plant

  • Does all Plant inducted have all the relevant documentation and been copied and filled?<br>Including IBC Plant Induction Checklist, Risk Assessment, Log Books, Operators Licenses/ Competencies Daily Pre Start Checklist

  • All Plant has an IBC Inspection sticker

  • Review Site Plant Register and confirm if any plant is due for servicing

  • Confirm all relevant Permits to Work are in place for Crane

  • Confirm all relevant Permits to Work are in place for Excavation

  • Site map clearly indicates the location of all existing overhead/ underground services and Plant has been made aware

  • Movement of plant on site is monitored and controlled

Working at heights

  • Have the risks been adequately identified

  • Is there fall protection for work over 2 metres

  • Scaffolds approved to Australian Standards and erected to manufacturers specifications, including handover certificates with monthly inspections

  • Regular testing, certification and visual inspections (prior to use) of all fall restraint equipment/ systems

  • No trestles over 2 metres without fall protection

Materials storage

  • Materials and equipment stored in a safe manner, not protruding into walkways and will not fail

  • All Dangerous Goods and chemical storage adequate for the project

Dangerous Goods and Hazardous Substances

  • Up to date register available for all DG and HS

  • MSDS available and readily accessible for all site personnel

  • MSDS safety procedures for all DG and HS included in SWMS with any new substances added lately

  • Spill controls available and adequate (spill kits, bunding, etc)

  • Exposure monitoring and health surveillance

Environmental

  • Are silt traps in place, clean and operating as required

  • Have washout facilities been provided and are operating as required

  • Are all TPZ in place and operating as required

  • Site skips are adequate for site operations

  • Spill kit location are appropriate and free from damage

  • Monthly Site recycling reports are posted on site notice board

Noise control

  • Is hearing protection available and used

  • Have there been any noise complaints received

Gas propelled/ Compressed air tools

  • SWMS available and up to date

  • Hoses, couplings and clips inspected and in good condition

  • Hoses secured to avoid whipping

Explosive powered tools

  • SWMS covering their use

  • PPE available with warning in use

  • Operators have verification of competency

  • Kept locked away when not in use

Quality

  • Are there quality ITP in place for current scope

  • What number of ITPs are underway

  • Quality Inspection Forms complete as required for Pre Pour, Pre Sheet, Waterproofing, Roofing

  • What number are completed

SWMS Review

  • Subcontractor Name

  • Trade

  • SWMS Number

  • SWMS Name

  • Version #

  • Work being undertaken in accordance with SWMS

  • IBC SWMS review complete

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.