Information
-
USER GUIDE
-
(Health & Safety instruction & training is provided to Stowe personnel and the following checks take this and other training into consideration to ensure safe systems of work are understood and implemented).
-
Branch:
-
Job Number:
-
Project / Site Name::
-
Employee Job Title:
- Apprentice 1st Year
- Apprentice 2nd Year
- Apprentice 3rd Year
- Apprentice 4th Year
- Trades Assistant
- Communications Technician
- Licensed Electrician
- Leading Hand Electrician
- Foreperson
- Service Technician - Licensed Electrician
- Service Technician - Communication Only
- Administrator
- Plant Operator
- Driver
- Other
-
Employee Name:
-
Conducted by (Name):
-
Conducted on
Employee Safety Audit
Section 1: Yes or No - Tick one box applicable for each question:
-
1. Have you read Stowe Australia's Health and Safety Management Plan for the project / service job you are currently working on?
-
2. Can you produce you’re Construction Industry General Safety Induction Card? (Blue, Red, White card etc.)
-
3. Do you undertake Hazard Identification, Risk Assessment & implement risk controls before each task?
-
4. Have you reviewed & signed on to SWMS for all High-Risk Construction Work (HRCW) before commencing it?
-
5. Life Threatening & Severe risks are eliminated as reasonably practicable before work commences?
-
6. Are you aware of the Stowe Australia Pty Ltd PROHIBITION of Work ON Energised Electrical Parts & Equipment?
-
7. Are you aware of the Stowe Australia's PROHIBITION of Work NEAR Energised Electrical Parts & Equipment unless authorised in writing by your Branch Manager?
-
8. Have you received training in Stowe’s Electrical Work Risk Assessment Process (E W R A P)?
-
9. Do you understand & comply with Stowe’s E W R A P Flowchart prior to undertaking all electrical work?
-
10. When contact with “Energised Electrical Parts / Equipment” is possible, do you use the E W R A P Report form?
-
11. Do you understand Stowe Australia’s MANDATORY 4 Stages of Isolation Procedure?
-
12. Do you isolate, lock and tag out & test the isolation on all electrical equipment before commencing work on it?
-
13. Do you arrange for a competent Safety Observer for testing/fault-finding on energised electrical parts & equipment?<br>
-
14. Do you understand an Isolation Register must be used & additional controls implemented for complex isolations?
-
15. Do you understand that volt sticks / test pencils are PROHIBITED to be used for verification of isolation tests?
-
16. Do you have suitably rated voltage test equipment in your tool kit?
- Yes
- No
- No I'm not competent to undertake testing
-
17. Are you aware of Stowe’s MANDATORY Arc Flash Clothing Standard & do you comply with these requirements?
-
18. Do you wear company supplied cotton drill long work clothing & PPE while at work?
-
19. Are you competent to use all mandatory PPE including Arc Flash Clothing?
-
20. Are you completing ITPs/FIC’s progressively as works occur while – installing / testing / commissioning? (Note: Test Records on a Service Report may be used in place of ITP's/FIC's for reactive service work).
Section 2 Multiple Choice - Select one box only applicable to each question
-
21. What do you do if HRCW to be undertaken has hazard(s)/risk(s) not included or adequately controlled in SWMS? (Select 1 below)<br>i) Discuss, Agree & include risk controls into the SMWS prior to commencing the work;<br>ii) Discuss, Agree & include risk controls into the Mandatory Pre-start/General Risk Assessment form prior to commencing;<br>iii) All the above ensuring the risk controls are selected in accordance with the hierarchy of controls as reasonably practicable.<br>
-
22. What do you do when changes occur on site/in the workplace or new hazards are introduced? i) Identify Hazards, Assess the Risks, Review current risk controls in SWMS & Safe Work Procedures for adequacy; ii) Let others know as soon as these are identified; iii) Stop work and contact your supervisor if any uncontrolled Life Threatening or Severe risk(s) of harm are identified; iv) All of the above.
- i).
- ii).
- iii).
- iv).
3. Short Answer
-
23. i) Who do you notify when an incident / accident occurs? & ii) when do you notify them?
-
24. What forms do you complete after an incident / accident?
-
25. Who is the company’s Branch Return to Work Coordinator?
-
26. Who is responsible for your own health & safety?
-
27. When do you fill out either a TCA1 / Certificate of Compliance when doing Data / Electrical work?
-
28. When is an approved EWRAP Report required?
-
29. Who has the authority to allow work to commence under an approved EWRAP Report?
-
30. What is the definition of a “Complex Isolation” (refer: HSMP - "Mandatory Isolation Procedure" / HSE Manual - Safe Electrical Work Practices - Isolation)?
-
31. When is testing / fault finding of energised electrical equipment permitted?
3.0 Employee Comments, if any:
-
Comments:
-
Employee Signature:
4.0 Conductor Comments, if any:
-
Comments:
-
Conducted by: