Information
-
Project No.
-
Project
-
Conducted on
-
Prepared by
ALWAYS REMEMBER!
-
1 - No exposed live parts
-
2 - Make sure its metal parts are earthed3 -
-
3 - Meggar it
-
4 - Correct circuit protection
-
5 - IP rating is correct
-
6 - Do you have all testing equipment to carry out the "testing of an installation"?
TICK EACH ITEM BELOW WHEN COMPLETE
-
1 - Consumer mains installed and terminations are tightened?
-
2 - Ensure single core cable installed as to prevent eddy currents. (Not seperated through steel materials)
-
3 - Main earth is installed the correct size, mechanically protected, exposed to weather & in site boundry and do not remove tag fitted. Ensure 2000mm away from W.P HV earthing and painted with galvanised paint.
-
4 - All incoming cables to be protected from sharp edges i.e. Bushing or grommet strip.
-
5 - Ensure all circuits breakers orientated the same way.
-
6 - Ensure all mechanical enclosures are adequately earthed.
-
7 - All neutral or earth cables run on series or parallel must be terminated in one connection.
-
8 - MEM installed and labelled on link and escoutcheon if required. MEN to be same size as neutral, ensure continuity to enclosure.
-
9 - Remove all meter fuses and meggar test switchboards - re-install fuses.
-
10 - Ensure all CT shortout links are disconnected.
-
11 - Test consumer mains & main earth & record results. Main earth > 0.5ohms / consumer > 1 M ohm should be greater than 2000M W.
-
12 - Inspection of switchboards to ensure all connections are tight, clean and clear of foreign objects. Ensure no exposed live parts, and no spaces greater than 5mm on cable entries.
-
13 - Check phase rotation.
-
14 - Lockout main switch and fit danger tags as required.
-
15 - Ensure all final sub circuits are labelled, including manufacturers connections.
-
16 - Ensure all outgoing circuits disconnected or locked and tagged out, unless safe to energise.
-
17 - Ensure 600mm access available with doors open.
-
18 - Install out of service tag to SPD as required.
-
19 - Check flash guards installed to line side consumer mains if over 800amps.
-
20 - Install site plan on switchboard detailing location of consumer mains & main earth.
-
21 - Label fitted to Essential Services main switches - IN THE EVENT OF FIRE , DO NOT SWITCH OFF
-
22 - Check SPD and/or main switch overload protection has been set up "or arranged to be set" as per WP requirements.
-
23 - Check circuit breaker overloads are set correctly as per SLD, where applicable.
-
24 - Cable lugs are correctly crimped and heat shrink does not extrude onto palm of lug.
-
25 - Ensure there are no obstructions between palm of lug and point of connection.
FINAL CHECKS
-
Can Completion Notice be submitted?
-
Ensure MEN is re-installed.
-
Complete and signed Electrical Safety Certificate.
-
Complete and sign Installation Test Certificate and attach to meter box.
-
COMMENTS
ELECTRICIANS DECLARATION
-
By signing below I confirm that I have completed all the above and checked/tested the work complies with AS/NZS 3000:2007
-
E/W License No.
-
Electrician
-
Notice No.
-
Meter No.
-
Seal No.
PROJECT MANAGER AUTHORISATION
-
I acknowledge that the above Electrician is competent and capable of carrying out the above works.
-
Project Manager