Information

  • Project No.

  • Project

  • Area

  • Lot Number

  • Lot Description

  • Conducted on

  • Prepared by

GENERAL INSPECTION

  • Does the Project Specification call for specific test results to be provided? If yes please attach all test results / reports

  • Has the test equipment been calibrated?

  • Is the MEN link in position and connected correctly?

  • Have all labels for earth locations been shown in corresponding switchboard s?

  • Have labels been attached to earth stakes?

  • Has fault protection on MCCB's been set?

  • Gas cascading and discrimination of MCCB's been calculated?

POLARITY CHECK

  • Has the polarity checking been completed?

  • Were the polarity check results satisfactory?

  • Has the three phase rotation been checked on three phase circuits?

INSULATION RESISTANCE REST

  • Has the insulation resistance to all mains / submains / switchboards and equipment been tested?

EARTH CONTINUITY AND RESISTANCE

  • Has the earth resistance of the main earthing conductor been check? (Record result below)

  • Result in ohms

  • Has the earth continuity to each and every light point, power outlet or electrical appliance been confirmed?

RCD AND EFLI TESTS

  • Have RCD tests and earth fault loop impedance (EFLI) tests been carried out on power outlets, light points and equipment?

  • Is the EFLI results satisfactory in accordance with AS/NZS 3000:20070 Table 8.1?

  • Have all RCD units been functionally tested?

  • Operator name

  • Supervisors name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.