Title Page
-
Prepared by
-
Conducted on
-
Primary Pump 1
-
Primary in Service - Temperature Gun the Inlet of Pump
-
Primary Pump 2
-
Booster Pump 1
-
Booster Pump 2
-
Booster Pump in Service - Temperature Gun the Discharge of the Pump
-
Heat Dump Pump
-
Grate Water Pump
Ashing System
-
Ash Bed Level
-
Number of Grates Ran - In the Field
-
Ash Bin Changed out
-
Ash Bin Temperature in Fahrenheit
Soot Blowers
-
Test Soot Blower Rotation
Air Locks
-
Multi-clone
-
Pre-Heater
-
Preheat & Rate
-
Primary Ash
Flue Gas
-
Flue Gas Temperature
-
Flue Gas Ambient Temperature
HPU Room
-
Unloader Rake Speed
-
HPU Unloader Pump 1
-
HPU Unloader Pump 2
-
HPU Oil Level
Hog Fuel System
-
Fuel Bin Level
-
Hog Fuel Quality
-
Chute 1
-
Chute 2
Cells
-
Flame Quality in Cell 1
-
Flame Quality in Cell 2
Precipitator
-
Rate the condition of the Rappers
-
Precipitator Report - Electrical AMPs
-
Precipitator Report - Electrical VOLT
-
Precipitator Report - Electrical mA
-
Precipitator Report - Electrical KV
-
Precipitator Report - Electrical SCR (Selective Catalytic Reducer)
-
Precipitator Report - Electrical KW
-
Precipitator Report - Electrical S/M
-
Precipitator Report - Electrical Light
System Down Time
-
Was there time that the system was not getting sufficient heat to the KILNS to keep it operating? Describe.