Title Page

  • Supplier Name

  • Product Category

  • Location

  • Conducted on

  • Prepared by

General Information

  • Date established

  • Total annual sales

  • No. of Employees

  • No. of Quality Control Employees

  • No. of Operators

  • No. of Machines

Quality Control

  • What is the company's quality policy?

  • Do they have testing facilities?

  • Does the supplier conduct inward material inspection?

  • How does the company ensure the quality standards for their finished goods?

Supplier Capacity

  • Does the supplier have single or multiple sources for their raw material

  • Are major raw materials imported or domestically sourced

  • Which country are they imported from?

  • Raw material lead time

Maintenance

  • Is equipment failure down time calculated?

  • Are there checklists for maintenance? Do they seem to be followed?

Visual Control

  • Is the number of pieces per labor hour displayed on a wall, and tracked day-by-day?

  • Is the amount of scrapped material displayed on a wall, and tracked day-by-day?

Degree of "Lean-ness"

  • Can you see a lot of inventory kept before production and kept between each production step?

Production

  • Before a new product is launched, are some jigs/tools prepared by the engineering department?

  • Is pre-production inventory well organized?

  • Is work-in-process inventory stored in a predictable way, or do people need to look around to find what they need?

  • Is the production a continuous flow?

  • Is there a kanban system? (very good)

  • Is there a list of approved subcontractors, who can take over part of the job? For which process steps?

  • Is there a power generator?

  • Is equipment failure downtime calculated?

  • Are there checklists for maintenance? Do they seem to be followed?

  • Is the proportion of on-time shipments displayed on a wall, and updated at least weekly?

  • Is the time to make one piece, from start to finish, displayed on a wall, and updated daily?

Compliance

  • Are there enough fire extinguishers (in workshops, dormitories)? Are they accessible, and up to date?

  • Are there enough emergency exits? Is it possible to lock them? Are they used as storage areas?

  • Do workers have appropriate personal protective equipment (gloves, masks, glasses, safety boots)?

  • Are there enough first-aid kits? Are they available and full?

  • Does production generate a lot of waste? Is this waste treated?

  • Has the factory invested in energy-efficient equipment?

Summary of Findings

  • General organization in the factory

  • Working environment (light, noise..)

  • Motivation of top management

  • Ease of mutual understanding

  • Can they make our product?

  • Do they have enough capacity?

  • Do they already sell to our country?

  • Do they understand our standards?

Completion

  • Full Name and Signature of Inspector/QC Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.