Information
Audit Checklist
-
Audit Title
-
Factory / Department
-
Conducted on
-
Auditor(s)
Audit scope
-
Process to Audit - Engineering
-
Standard Procedures for this process - 25,27,28,80,90
-
Standard Procedures Audited - 25,27,28,80,90
-
Applicable Clauses of ISO9001 standard
Compare documentation vs. Requirements
Section 1
-
In general, does SBG documentation meet the requirements of ISO 9001 ?
-
Review any customer requirements that may be applicable to this processes. (If there are none, enter “N/A”) In general, does SBG documentation meet these requirements?
-
Review any statutory or regulatory requirements that may be applicable to this process. (If there are none, enter “N/A”) In general, does SBG documentation meet these requirements?
Compare Actual Practice vs. Requirements of ISO and Procedures
-
Review previous audits for this process. Review previous ACAR issued against this process, or as a result of previous audits for this process. Add additional checklist questions here, based on the previous audits, ACARs or other documents or requirements, as you see fit.
-
Do personnel in this department know how to view Standard Procedures via the computer system?
-
Has the control and issuing of Drawings been carried out as per Procedure 25?
-
Evidence
-
Are Sales Orders being reviewed and released by the D.O in a timely manner?
-
Evidence
-
Has the proper process been followed when processing a job as per Procedure 90?
-
Evidence
-
Has the filing and storing of drawings been adhered to Procedure 25?
-
Evidence
-
Has the control and issuing of customer specifications been properly adhered to as per Procedure 27?
-
Evidence
-
Has the control of National/International standards been properly adhered to as per Procedure28?
-
Evidence
-
Has new or revised national/International standards been logged into the system correctly as per Procedure 28?
-
Evidence
-
Are Drawings and Specifications properly authorised?
-
Evidence
-
Are training records in the department up to date?
-
Evidence
-
Has the electronic records been kept up to date and backed up as per Procedure 80?
-
Evidence
Verify the Effectiveness of the Process
-
Are the procedure steps accurate and complete as compared to true practice?
-
Are there sufficient check steps (inspections, tests, reviews, approvals, sign-offs, etc.) that ensure the process outputs meet requirements before passing onto the next process?
-
Does the process appear to adequately meet the requirements of ISO 9001 and the SBG documentation?
-
Does the process appear to adequately meet all customer or regulatory requirements?
-
Does the Auditee have any suggestions for procedural or process enhancements, which will augment the continuous improvement of the system?
Additional Evidence
-
Evidence
Audit Sign Off
Sign Off
-
I, the undersigned, have completed this audit in an accurate manner. I have attached evidence as required and declare this assessment complete.
-
Full name and signature of auditor