Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Engineer
-
1.1 Engineers Name
-
1.2 Engineer Photo
-
Add media
-
Discipline
- Electrical Engineer
- Mechanical Engineer
- AC Engineer
- Gas Engineer
- Handyman
- Multi-Discipline Engineer
- Fabric
-
1.3 How was the engineer informed of the audit?
2 PPM Task Audit
-
2.1 PPM task carried out
-
2.2 Was the task completed in a timely manner.
-
2.3 Did the task require the engineer to work to a site specific Method Statement
-
2.4 Was the PPM task carried out correctly.
-
2.5 Was the task carried out safely?
-
2.6 Were the correct tools used ?
-
2.7 Was a meter used to carryout the task ?
-
2.8 Is the meter calibrated ?
-
Select date
-
2.9 Did the engineer use steps to carryout the task?
-
2.10 Are the steps fit for purpose.
-
2.11 Is the plant left clean and tidy.
3. On site Paperwork
-
3.1 Log book Paperwork to completed
-
3.2 Was the paperwork completed correctly in the log book
3 Risk Assessment
-
3.1 Has the RA been Completed correctly
4. PPE
-
4.1 Has the engineer used the correct PPE for the task
-
4.2 Does the engineer need additional PPE to carry out task.
5. IBMS
-
5.1 Has the engineer closed the PPM task on the IBMS ?
6 Training
-
6.1 Does the engineer need additional training
7. Engineer Feedback
-
7.1 Has the engineer requested training previously
8. Additional Information \observations
9. Sign off Audit
-
Engineer Signature .
-
Auditor Signature.