Title Page
-
Site Name and Number
-
PPM Tasks Number(s) carried out
- R1 Compressor/Packs
- R2 Condenser/Gas Cooler
- R6 William Integral Cabinets
- R7 Cold Stores /Cold rooms
- R8 REfrigeration Controllers
- R9 All fixed refrigerant pipe work and insulation
- R10 Retarder Prover
- R11 Ice machines
-
Metrix Task Number(s)
-
Verisae Task Number(s)
-
Engineer
PLEASE EMAIL THIS AUDIT TO: DL_NOC-ContractSupport-PPM@space-engineering.co.uk & cc Darren.Hogg@space-engineering.co.uk
BEFORE STARTING WORK, RISK ASSESS YOUR WORKING AREA AND ENSURE YOU COMPLY WITH ALL HEALTH & SAFETY REFULATIONS.
ENSURE YOU LOG ON AND OFF VERISAE IN REAL TIME
-
Please tick the relevant PPM task's and provide asset numbers for each task carried out.
- R1 Compressor/Packs
- R2 Condenser/Gas Cooler
- R6 William Integral Cabinets
- R7 Cold Stores /Cold rooms
- R8 REfrigeration Controllers
- R9 All fixed refrigerant pipe work and insulation
- R10 Retarder Prover
- R11 Ice machines
-
Assets here please.
-
Do you need to arrange a return visit to complete the work?
-
If a return visit is required, please briefly explain why
If a return visit is required, please call the PPM team/SME to arrange a date for a return visit to complete the work once all spares are available
-
Is the PPM complete?
-
Does any of the equipment need adding to the dilapidation list?
-
Any further notes/comments
-
Store Manager Name and Signature
-
Date and Time