Title Page
-
Conducted on
-
Prepared by
-
Location
-
Client / Site
-
Block B - 1st Fix Baths , Shower Trays , Kitchen and HIU Cupboard
-
Client : Cilantro
-
London City Island Phase 2
-
Select date
-
Select Block
-
Level
-
Flat number
-
Flat type
Kitchen Inspection
-
Insulation valves installed in Hot + Cold pipe ?
-
Insulation valves installed in Hot + Cold pipe ?
-
Non return + washing machine valve installed to dishwasher feed ?
-
Non return + washing machine valve installed to dishwasher feed ?
-
Kitchen waste run ?
-
Kitchen waste run ?
-
Are fittings crimped?
-
Hot and Cold pipe lagged ?
-
Pipework left pressurised ?
-
Waste pipework is installed with swept bends where possible instead of knuckle bends ?
-
Enviromech QA done by :