Block B - 1st Fix Baths , Shower Trays , Kitchen and HIU Cupboard
-
Client : Cilantro
-
London City Island Phase 2
-
Select date
-
Select Block
-
Level
-
Flat number
-
Flat type
Baths,Shower Trays Inspection
-
Bath / Shower tray it is installed correct at the right height ?
-
Bathroom
Kitchen Inspection
-
Insulation valves installed in Hot + Cold pipe ?
-
Insulation valves installed in Hot + Cold pipe ?
-
Non return + washing machine valve installed to dishwasher feed ?
-
Non return + washing machine valve installed to dishwasher feed ?
-
Kitchen waste run ?
-
Kitchen waste run ?
-
Are fittings crimped?
-
Hot and Cold pipe lagged ?
-
Pipework left pressurised ?
-
Waste pipework is installed with swept bends where possible instead of knuckle bends ?
Cupboard (HIU) Inspection
-
Is the HIU fitted minimum 100mm off the wall ?
-
Are the waste, PRV and the water feed (washing machine) installed correctly ?
-
Are the waste, PRV and the water feed (washing machine) installed correctly ?
-
Is the HIU protected ?
-
Is the HIU protected ?
-
Is the water meter installed ?
-
Is the water meter installed ?
-
Is the lagging installed ?
-
Primary flow / return lagged in phenolic insulation ?
-
Enviromech QA done by :