Title Page

  • Conducted on

  • Prepared by

  • Location
  • Client / Site

  • Block B - 1st Fix Baths , Shower Trays , Kitchen and HIU Cupboard

  • Client : Cilantro

  • London City Island Phase 2

  • Select date

  • Select Block

  • Level

  • Flat number

  • Flat type

Cupboard (HIU) Inspection

  • Is the HIU fitted minimum 100mm off the wall ?

  • Are the waste, PRV and the water feed (washing machine) installed correctly ?

  • Are the waste, PRV and the water feed (washing machine) installed correctly ?

  • Is the HIU protected ?

  • Is the HIU protected ?

  • Is the water meter installed ?

  • Is the water meter installed ?

  • Is the lagging installed ?

  • Primary flow / return lagged in phenolic insulation ?

  • Enviromech QA done by :

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.