Title Page
-
Conducted on
-
Prepared by
-
Location
-
Client / Site
-
Block B - 1st Fix Baths , Shower Trays , Kitchen and HIU Cupboard
-
Client : Cilantro
-
London City Island Phase 2
-
Select date
-
Select Block
-
Level
-
Flat number
-
Flat type
Cupboard (HIU) Inspection
-
Is the HIU fitted minimum 100mm off the wall ?
-
Are the waste, PRV and the water feed (washing machine) installed correctly ?
-
Are the waste, PRV and the water feed (washing machine) installed correctly ?
-
Is the HIU protected ?
-
Is the HIU protected ?
-
Is the water meter installed ?
-
Is the water meter installed ?
-
Is the lagging installed ?
-
Primary flow / return lagged in phenolic insulation ?
-
Enviromech QA done by :