Title Page

  • Conducted on

  • Prepared by

  • Block B 2nd fix apartment

  • Client: Cilantro

  • Project: London City Island Phase 2

  • Select date

  • Select Block :

  • Level :

  • Flat Number:

  • Flat Type :

Bathroom Inspection

  • Bathroom

  • En-suite

  • Are the mixers installed and undamaged ?

  • Are the mixers protected ?

  • All chrome riser installed and undamaged ?

  • Traps installed bath / shower ?

  • Traps installed basin ?

  • Are the toilets in good condition,with no scratches or abrasions?

  • Are the toilet installed to the correct position and level ?

  • Have the toilets been protected ?

  • Have the correct basins been installed

  • Are the basins installed to the correct height ?

  • Are the basins level ?

  • Have the basins traps been installed ?

  • Are the basins in good condition, with no scratches or abrasions ?

  • Have the basins and taps been protected ?

  • All items installed are free of damage ?

  • Enviromech QA compleat by :

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.