Title Page
-
Conducted on
-
Prepared by
-
Block B 2nd fix apartment
-
Client: Cilantro
-
Project: London City Island Phase 2
-
Select date
-
Select Block :
-
Level :
-
Flat Number:
-
Flat Type :
Bathroom Inspection
-
Bathroom
-
En-suite
-
Are the mixers installed and undamaged ?
-
Are the mixers protected ?
-
All chrome riser installed and undamaged ?
-
Traps installed bath / shower ?
-
Traps installed basin ?
-
Are the toilets in good condition,with no scratches or abrasions?
-
Are the toilet installed to the correct position and level ?
-
Have the toilets been protected ?
-
Have the correct basins been installed
-
Are the basins installed to the correct height ?
-
Are the basins level ?
-
Have the basins traps been installed ?
-
Are the basins in good condition, with no scratches or abrasions ?
-
Have the basins and taps been protected ?
-
All items installed are free of damage ?
-
Enviromech QA compleat by :