Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Client / Site
-
Region
-
Contractor/s
-
Job Description
-
Site
-
Date
-
Time
1. Environmental Management
-
Does the JSA identify environmental risks and controls?
-
Have the appropriate controls been put in place on site?
-
Are the potential environmental risks and issues understood by the Site Manager
-
Are staff aware of how to report an environmental incident/near miss?
2. Waste Management
-
Is there an opportunity for waste to be segregated on site?
-
If so, is waste segregated correctly?
-
Is waste in stored suitably in line with MNG-CG-0008 and MNG-CG-0018 (I.e. sealed, covered, bunded)?
-
Is the waste area well maintained and tidy?
3. Excavations
-
Are erosion and/or sediment control structures in place and stable?
-
Are erosion and/or sediment control structures located between source (i.e. spoil) and receptor (i.e. drain)?
-
When applicable, are excavation piles located more than 10m away from adjacent watercourses?
-
Where possible, are soils excavated in a way that will allow then to be replaced in the order of excavation to avoid the possibility of soil inversion?
-
Has any trench water encountered on site been disposed of by a suitable licenced contractor? (A transfer certificated required)?
4. Contaminated land
-
Has excavated spoil been appropriately managed in line with IWRG621?
-
Can evidence of soil classification documentation be produced for excess excavated soil that cannot be reused on site?
-
If handling contaminated soil, do the vehicles transporting excavated soil have the required EPA certificates/licences?
-
Do site staff have access to the relevant Service Provider waste management procedures?
-
Is siphon water encountered being captured by a suitable vehicle?
-
Following transportation, is siphon water disposed of correctly?
5. Pollution Management
-
Are all fuels and/or chemicals properly marked?
-
Are all fuels and/or chemicals stored in containers that are in good condition (i.e. no leaks present) as per MNG-CG-0016?
-
Are MSDS available for the chemicals stored on site?
-
Are spill kits available, and if required, in use correctly?
-
Does plant (including mobile plant) have adequate drip tray coverage?
-
Is mobile plant in good condition? (I.e. no sign of leaking and well maintained)?
-
Are effective controls in place to manage hazards that could lead to ground and water contamination?
6. Cultural Heritage
-
If applicable, does a Cultural Heritage Management Plan cover the works?
-
Do site staff have access to the Cultural Heritage Management Plan?
-
Are the recommendations within the CHMP being implemented on site?
7. Community relations/neighbours
-
Is noisy plant and machinery switched off when not in use?
-
Are the drip lines of any trees on site free of large/heavy equipment?
-
Has due care and attention been given to excavations beneath the drip lines of any trees?
-
Are dust generating activities (i.e. concrete cutting), being managed correctly i.e. water hoses attached to cutting equipment?
-
Are any spoil heaps covered or dampened down to avoid dust generation?
-
Comments