Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Region

  • Contractor/s

  • Depot

  • Audit Date

  • Time

1. Environmental Management

  • Does the JSA identify environmental risks?

  • Have appropriate controls been identified and are they in place on site?

  • Are the potential environmental risks and issues understood by the Site Manager

  • Have all site staff received VESI environmental training?

  • Do staff understand the the process or environmental incident reporting?

  • Are staff aware of how to report an environmental incident/near miss?

2. Waste Management

  • Is there an opportunity for waste to be segregated on site?

  • If so, is waste segregated correctly?

  • Is waste in suitable containers (sealed, covered, bunded)?

  • If applicable, is the waste area well maintained and tidy?

3. Land and Site Management

  • If applicable, are the relevant consents and permits required to work available on site?

  • Is work being completed inline with agreements made to achieve these consents or permits?

  • Are all potential pollutants (i.e. chemicals and oils) stored and labelled correctly?

  • Are MSDS available for the chemicals stored on site?

  • Are there adequate spill kits available on site?

  • Does plant (including mobile plant) have adequate drip tray coverage?

  • Is there evidence that mobile plant is leaking?

  • Does staff complete site and smell tests to potentially identify contaminated land?

  • Is there a specific area for the refuelling of plant and machinery?

  • If applicable, is there fire fighting equipment available, and is it appropriate?

  • If known contamination is present on site, are control measures in place?

  • If contamination is not present on site, how has this been determined?

  • Has excavated spoil been subject to the required testing (as per MNG-CG-0018 Waste Management)

  • Are records available for the classification, transfers and disposal of waste?

  • Has syphon water been tested for contamination?

  • Are records available for the classification, transfers and disposal of syphon water?

4. Water

  • Is run-off managed to avoid groundwater contamination?

  • If applicable, are adequate measures taken to prevent silty construction run-off escaping site?

  • Are spoil heaps located sufficient distance from a watercourse (i.e. >10m where possible)

  • Is waste water managed in accordance withas per MNG-CG-0016 Waterways, Stormwater and Run-off

5. Community relations/neighbours

  • Have locals been informed of the proposed works?

  • Have there been any complaints and have they been actioned accordingly?

  • Is noisy plant and machinery left idle while not is use?

  • Are dust generating activities (i.e. concrete cutting), being managed correctly i.e. water hoses attached to cutting equipment?

  • Are any spoil heaps covered or dampened down to avoid dust generation?

  • If applicable, is on site lighting downward or task facing?

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.