Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Corridor

Project and Inspection Details

  • Project Name

  • Current Works Description

  • Inspector and Attendees

  • Project Manager

  • Company (ARTC or Contractor)

  • Approval Type (TBEIA / REF (NSW only) / EMP)

  • Weather Conditions

Documentation/Records

  • Environmental documents on site e.g. EIA (REF/TBEIA) / EMP?

  • Add media

  • Permits/licences/Approvals on site?

  • Add media

  • Have site personnel undertaken environment site induction on environmental management and site specific issues?

  • Add media

Site Offices and Amenities

  • Are offices and amenities located a suitable distance from sensitive receivers and environmentally sensitive areas?

  • Add media

  • Has weed growth around offices and amenities being adequately controlled?

  • Add media

  • Has pedestrian and private access been maintained?

  • Add media

  • Is appropriate signage in place for pedestrians and road users?

  • Add media

Air Quality

  • Are dust control measures being implemented where applicable?

  • Add media

  • Have materials been stored appropriately to minimise dust emissions?

  • Add media

  • Are site access tracks being watered down as appropriate?

  • Add media

  • Is vehicle use restricted to designated access tracks?

  • Add media

  • Are truck loads covered?

  • Add media

Erosion and Sediment

  • Are erosion and sediment controls in place around the work site?

  • Add media

  • Do the erosion and sediment controls require repair or maintenance?

  • Add media

  • Has topsoil been stockpiled separately from subsoil?

  • Add media

  • Are stockpiles of suitable height and have they been stabilised?

  • Add media

  • Is clean water diverted around exposed or disturbed areas?

  • Add media

  • Has any dirty or sediment laden water transferred off-site?

  • Add media

  • Are there any areas of scour or erosion?

  • Add media

  • Has sediment tracking onto public roads been minimised?

  • Add media

Water Quality and Watercourse Protection

  • Has dewatering occurred (from pits or basins) and has water been treated prior to flowing off-site?

  • Add media

  • Have concrete washout pits been lined and established away from drainage depressions and watercourses?

  • Add media

  • Are materials stored more than 40m from watercourses?

  • Add media

  • Are MSDS available and being complied with?

  • Add media

Land and Water Contamination

  • Are material storage areas free from discolouring or staining?

  • Add media

  • Are refuelling, maintenance and wash-down areas bunded or adequately protected?

  • Add media

  • Are fuels, oils and chemicals stored within bunded areas (minimum 110% of the volume of the volume stored)?

  • Add media

  • Are bund areas clean and free of water/liquid?

  • Add media

  • Are spill kits located near fuel storage and refuelling areas?

  • Add media

  • Are spill kits stocked and maintained?

  • Add media

Waste

  • Is waste (including asbestos) being appropriately managed (segregation, storage and removal)?

  • Add media

  • Is the work site clean and tidy (free of waste and personal rubbish including cigarette butts)?

  • Add media

  • Is suitable excavated material fit for reuse used onsite?

  • Add media

  • Is waste, oils and chemicals collected and disposed by a licensed contractor to a licensed facility?

  • Add media

Heritage

  • Indigenous Heritage areas or objects signposted and protected?

  • Add media

  • Non-Indigenous Heritage items signposted and protected?

  • Add media

Flora and Fauna

  • Has the site boundary and areas of sensitive vegetation been delineated and protected?

  • Add media

  • Are protection barriers in place to protect retained vegetation?

  • Add media

  • Weed controls in place to prevent the transport of identified noxious weeds offsite?

  • Add media

  • Are the drip line of retained vegetation free from stored materials or plant/equipment?

  • Add media

Noise and Vibration

  • Are fixed noise sources positioned to minimise potential impact on sensitive receivers?

  • Add media

  • Is plant and equipment shutdown to prevent idling unnecessarily?

  • Add media

  • Have activities been planned and undertaken within project and regulatory permitted hours?

  • Add media

  • Have community notification requirements been managed?

  • Add media

  • Is lighting appropriately located to avoid light spill to sensitive receivers?

  • Add media

Recommended Actions

  • Recommendation

  • Environmental Non-Conformance

  • Responsibility

  • Due Date

  • Signature

  • Recommendation

  • Environmental Non-Conformance

  • Responsibility

  • Due Date

  • Signature

  • Recommendation

  • Environmental Non-Conformance

  • Responsibility

  • Due Date

  • Signature

  • Recommendation

  • Environmental Non-Conformance

  • Responsibility

  • Due Date

  • Signature

  • Recommendation

  • Environmental Non-Conformance

  • Responsibility

  • Due Date

  • Signature

  • Recommendation

  • Environmental Non-Conformance

  • Responsibility

  • Due Date

  • Signature

  • Recommendation

  • Environmental Non-Conformance

  • Responsibility

  • Due Date

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.