Information

  • SLAC - SUSB - EOP#

  • EOP Title

  • Site

  • CREATION DATE

  • Revision Date

  • Revision Number

  • Procedure Author

  • Site Address

Procedure Overview

  • Work Areas Affected

  • Define Other Area

  • Detailed Location Information - Specific information of areas impacted. Room numbers, floor numbers, etc.

  • Select all affected Systems (Check all that apply)

  • Define Other Systems

  • Pictures of System Drawings -

  • Details of all equipment impacted by the event.

  • Equipment
  • Equipment I.D. Nomenclature

  • Equipment Description

  • Photo of Equipment

Personnel Required:

  • Determine the Technical position type of staff required to perform the work.

  • Position or Trade
  • Select Position / Trade

  • Define Other Position / Trade

  • Skill Level Requirement

  • Define Other Skill Requirement

  • Define responsibilities of this position

  • Determine the Management / Leadership position type of staff required to perform the work.

  • Management Position
  • Select Management / Leadership position

  • Define Other Management / Leadership

  • Define responsibilities of this position

  • Determine Additional Support Position

  • Additional Support Position
  • Select Additional Support Positions

  • Define Other Additional Support

  • Define responsibilities of this position

Scope, Purpose and Responsibilities

  • Provide an overview of the procedure and summarize expected impacts while performing the work as well as expected outcomes of completing work.

  • Scope of Procedure - Overview of the Work to Be Performed. What are we doing?

Impacts to the Facility

  • Detail of Impacted Facility Systems

  • Main Utility Equipment

  • What Utilities are impacted? (Select all that apply)

  • Provide details of specific impact.

  • Emergency Generator System

  • Provide Details of specific impact.

  • Cooling System

  • Provide Details of specific impact.

  • Heating System

  • Provide Details of specific impact.

  • Fire Monitoring System

  • Provide Details of specific impact.

  • Fire Detection System

  • Provide Details of specific impact.

  • Fire Suppression System

  • Provide Details of specific impact.

  • BMS - Building Management System

  • Provide Details of specific impact.

  • Security System

  • Provide Details of specific impact.

  • General Power and Lighting Systems

  • Provide Details of specific impact.

  • LOTO (Lock-out / Tag-out) Required?

  • List Specific valves, circuit breakers, panel numbers, etc.

  • LOTO Item
  • LOTO Item Description

  • LOTO Item Photo

Supporting Documentation

  • Identify all documents required to support successful completion of this work.
    Example: OEM manual, site safety plan, Emergency generator shutdown procedure, communication informing key stakeholder of work to be performed, hot work permits, etc.

Safety Requirements

  • All personnel involved in the procedure have read and agree to adhere to the SLAC “Worker Safety and Health Program.

  • Are there potential hazards?

  • Potential Hazards (check all that apply).

  • Define "Other Hazard"

  • Personnel Protective Equipment (PPE) required. Check all that apply

  • Define "Other" Personal Protective Equipment

Procedure Risks, Contingency Plans, & Assumptions

  • Refer to Site Specific Facility Operations Manual (FOM) Maintenance Management Plan (MMP) Risk section for Level of Risk definitions.
    Assessing Risk
    Use the Risk Assessment Code (RAC) matrix below to assess the risk of each hazard. To use this matrix:
    • Find the “severity” or the worst-case outcome of a mishap from the hazard along the left side of the matrix. The possible consequences are:
    Class I – Catastrophic. A condition that may cause death or permanently disabling injury or facility destruction.
    Class II – Critical. A condition that may cause severe injury or occupational illness, or major property damage to facilities, systems or equipment.
    Class III – Moderate. A condition that may cause minor injury or occupational illness, or minor property damage to facilities, systems or equipment.
    Class IV – Negligible. A condition that could cause the need for minor first-aid treatment, but would not adversely affect personal safety or health; damage to facilities, systems or equipment more than normal wear and tear level.
    • Find the “likelihood” for mishap to occur across the top of the matrix. The possible likelihood estimates are:
    Likelihood A. Likely to occur.
    Likelihood B. Probably will occur.
    Likelihood C. May occur.
    Likelihood D. Unlikely to occur.
    Likelihood E. Improbable.
    • Find the RAC in the box where the “consequence” and “likelihood” cross.
    SEVERITY CLASS (I-IV) LIKELIHOOD ESTIMATE (A-E)
    A B C D E
    I 1 1 2 3 4
    II 1 2 3 4 5
    III 2 3 4 5 6
    IV 3 4 5 6 7

    For new procedures, establish mitigation procedures to bring the RAC into a green level (RAC Code 4-7) to the extent possible. RAC codes of 1, 2 and 3 must be reviewed and approved as described below prior to finalizing the Operating Procedure.

    If the RAC is… Then the risk is . . .

    1 SLAC Director is authorized to accept the risk with adequate justification in rare cases
    where critical tests must be done and the risk cannot be reduced.
    2 ESH Division Director or Chief Safety Officer is authorized to accept the risk with adequate justification.
    3 ESH Program Manager or equivalent management is authorized to accept the risk with adequate justification.
    4–7 Acceptable with controls – Facility Manager and EHS Coordinator is authorized to accept the risk with adequate justification.

  • Refer to Site Specific Facility Operations Manual (FOM) Maintenance Management Plan (MMP) Risk section for Level of Risk definitions.

  • Risk
  • Risk RAC (Risk Assessment Code)

  • Risk Details

  • Risk Contingency Plan

Notification

  • Notify SUSB Facility Management with status updates and when work begins and ends and follow SLAC standard notification procedures.

  • Notified
  • Name of Person to be notified

  • Title of Person to be Notified

  • Email of person to be notified.

  • Mobile phone of person to be notified.

Procedure Details

  • List the very specific steps that will be taken to complete this work. This should include every action taken from arrival on site to leaving the site and post notification to key stakeholders.


  • Procedure Steps
  • Step Detail

  • Supporting Photo

  • Initials of the people performing this step upon successful completion of this task

Procedure Approval

  • Dry Run Performed (Physical Walkthrough)

  • Management Representative Approval

  • Management Approval
  • Management Representative Name and Title

  • Management Representative Signature

  • Date of Management Representative Signature

  • Technical Representative Approval

  • Technical Representative ApproverT
  • Technical Representative Name and Title

  • Technical Representative Signature

  • Date of Technical Representative Signature

Notes

  • Notes:

  • Notes
The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.