Title Page
-
Machine Type
- Skidsteer
- 308.5 Excavator
- 140 Excavator
- 220 Excavator
- 650 Dozer
- D6 Dozer
- 160H Grader
- JD Loader
- Case Loader
- JD Rubber Tire Backhoe
- Case Backhoe
-
Prepared by
-
Conducted on
-
Location
-
Machine Hours at Start of Shift
Fluids
-
Fluid Leaks( fresh puddles under the machine)
-
Oil level/ Filter
-
Hydraulic Oil/ Filter
-
Transmission Level/ Filter
-
Coolant Level
Rest of Machine Outside
-
Condition of Fan Belt and Radiator
-
Condition of Fuel Cap/ Filters/ Water Separator/ Lines
-
Condition of Tires/ Undercarriage
-
Condition of Lines/ Fittings/ Cylinders
-
Steps and Handholds/ Door Handles
-
Metal Fatigue
Start Up/ Warm Up & Operating
-
Turn 4Ways/ Beacons/ Signal Lights On( any burnt out)
-
Turn Lights On( any burnt out)
-
Heater/ AC Working Properly
-
Ensure all Gauges Work Properly
-
Test Backup Alarm/ Horn
-
Cleanliness inside Cab
-
Condition of Glass/ Mirrors/ Wipers
-
Any Fresh Leaks after Startup
Ground Engaging Tools
-
Inspect Bucket for Wear/ Cutting Edge
-
Inspect Bucket Quick Attach on machines that are equipped
Cool Down/ Shut Down / Service
-
Fluid Levels
-
Clean Bucket
-
Batteries turned off on machines equipped with disconnect switch.
-
Machine Fueled at _____________ hrs
-
Machine hours at end of the shift
-
Remove Key and return to assigned basket
-
Signature
-
Instructor Signature