Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1.0 - BLANK HOPPER ( FP- 4)

  • 1.1 All components , present and tight

  • 1.2-Hopper central, position, blank fit

  • 1.3-stack retainers operation, position

  • 1.4- Photoeye operation, position and condition of hopper

2.0 - VACUUM PULL DOWN

  • 2.1 - Cups and hoses, condition, position, operation

  • 2.2 -vacuum pull down arms, position, condition, timing, lube

  • 2.3 - Vacuum release valve condition, timing, operation

  • 2.4 Vacuum pump and filters condition, operation, cleanliness

3.0 - FLAP FOLDERS

  • 3.1 - Drive arms condition, tight , timing , in & out position

  • 3.2 - Rack and pinion Rod Ends condition, operation, lubrication

  • 3.3 - Splines and shafts condition, operation, lubrication

  • 3.4 -mount arms condition, in line

  • 3.5- Flap guides condition, tight, straight

4.0 - BLANK PUSHER FEED

  • 4.2 - Pusher chain condition, tension and lubrication

  • 4.1 -Ensure back dead centre is 0+/-4 on encoder position

  • 4.3- Pusher drive pin and traveller condition and lube

  • 4.4 -Pusher carriage condition, wear and lubrication

5.0 - HOTMELT

  • 5.1 - Glue pattern , position, size<br><br><br>

  • 5.2 - Glue tank condition, charring, overflow, damage, operation

  • 5.3 - Guns and hoses, tight, leaks, abrasion, position, guiding

  • 5.4 - Photoeye condition, position, sensitivity

6.0 -CORNERPOST AND LAMINATION

  • 6.1 - Column folders& cylinders operation, condition, leaks, timing

  • 6.2 - Column presses condition, set up, lube, 2nd hole shortened angles

  • 6.3 - Column presses cylinder operation, leaks, position, timing

  • 6.4- Laminators rack and pinion operation, condition, lube, position

  • 6.5- Laminator cylinders & air timer operation, condition, leaks, timing

  • 6.6- Fingers condition, position, operation, leaks, timing

  • 6.7 - Blue feed wheels operation , condition, glue build up

  • 6.8 - Bed and Leaf springs condition, position, glue buildup

7.0 - FORMING

  • 7.1 -Blank position, guiding, movement, & rebound stops

  • 7.2 -Mandrel Rack & Pinion condition, Lube, grease points fitted

  • 7.3 - chamber, central, wear, operational, all parts present and tight

  • 7.4 -Roll over Rack and pinion operation, condition & lubrication

  • 7.5-Mould presses condition, operation, speed, mounts and timing

  • 7.6 -Claws condition, operation, speed, mounts and timing

  • 7.7- Expulsors condition, operation, lube, guides, bearings

8.0 -DRIVE SYSTEMS

  • 8.1 - Drive Belt condition, tension, over load limit switch setting

  • 8.2 - Chains condition tension, lube, overload limit switch setting

  • 8.3 - Nylon cams wear, cam follower, Mount & Lubrication

  • 8.4 -Gear wheels condition, lubrication, grease point fitted

  • 8.5 - Hand oilers operation, leaks, oil level

9.0 - STACKER

  • 9.1 - Belt condition, tension, tracking and lubrication

  • 9.2 - Elevator cylinder operation, condition, air leaks, lubrication & latches

  • 9.3 - Stack eject cylinder operation, condition, airleaks and Lube

  • 9.4 - Electrical cAbinet, controls and PE operation , condition and cleanliness

10.0 -ELECTRICAL

  • 10.1 - Elect cabinet, tidy, clean, locked, main switch lock fitted

  • 10.2 - Contactors, operation, condition

  • 10.3 - Push buttons, operation, condition, labelled

  • 10.4 -Wiring, condition, tidy, fastened, tagged

  • 10.5 - motor & VSD operation , condition, settings, speed

  • 10.6 - P.L.C battery condition

  • 10.7 - Screen operator interface operation, condition, all pages working

  • 10.8 - Hot melt time clock, setting, operation

11.0 Pneumatics

  • 11.1 - Cylinders, valves and tubes condition, operation, air leaks

  • 11.2 - Air supply unit condition, operation, gauges and auto drains

  • 11.3 - Pressure switch operation check, low pressure and happy settings

  • 11.4 -Pressure settings all regulators ( record values)

12.0 - SAFETY

  • 12.1 -Emergency stops condition, operation and labelled

  • 12.2 - Guard safety switches operation, condition

  • 12.3 - Top FORMING chamber guard condition, operation, correct lift kit

  • 12.4- All fixed guards in place , secure

  • 12.5 - All warnings and labels in place, readable

  • 12.6- Lightening, adequate, turned on

  • 12.7 - Clean And safe work area around m/c . PPE available and cond

  • 12.8 - Only trained operators operating machine

13.0 - GENERAL

  • 13.1 - machine cleanliness condition, over, under, deck, glue overspray

  • 13.2 - Machine feet and jacking screws condition, present and tight

  • 13.3 - Mounts and fastening present , tight bolts

  • 13.4- Timing of VAC cups, Mandrel and Pneumatics( rectify if necessary)

  • 13.5- Wind adjusters operation , condition , chain tension, lubrication

  • 13.6- Wind DIAL counters equal actual measurements

  • 13.7- Set up sheet and change over procedures available, correct

  • 13.8 - Manual and holder , fitted, condition

  • 13.9- MEX I.D tag fitted on all components

  • 13.10 - Product reject rate square, parallel, damage free, all glue bonded

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.