Information
-
Project Number
-
Audit Title
-
Client
-
Conducted on
-
Prepared by
-
Accompanied by
-
Location
-
Personnel
-
Company Division
- Demolition - London
- Infrastructure - Civils
- Washmills
- Erith House
- ABW
- Demolition - Regional
- Infrastructure - Remediation
- EPS
- Demolition - London (Basements)
- London Office
-
This report is to be used by the assessor to inspect the site and record any safety, health and environmental hazards. The assessor should also pick an area of further inspection (e.g. SSOW, PUWER, Emergency arrangements etc) to ensure these are compliant with regulations and in- house procedures
-
Overview of current works
-
Have items from previous inspections been closed out?
Safety Compliance Review (Site)
-
Hazard
-
Status
-
Closed out by (sign and date)
-
Hazard definition
- 1st aid
- displayed information
- project paperwork
- site welfare
- COSHH
- fire precautions
- safety signage
- work @ height
- excavations
- plant & machinery
- lifting equipment
- crane
- edge protection
- temp works
- hot works
- isolations
- portable tools
- hoist
- MEWPS
- hoarding and fencing
- traffic routes
- access and egress
- PPE
- housekeeping
- environmental
- health hazards
- public interface
- site security
-
Root Causality
- Design
- Error enforcing conditions
- Tools and Equipment
- Housekeeping
- Maintenance Management
- Procedures
- Training
- Communication
- Incompatibility of goals
- Organisation
- Defences
- Sub-contractor
Environmental and Sustainability Compliance Review (Site)
-
Are COSHH items being stored correctly?
-
Are waste and chemicals stored away from drains / drains protected?
-
Is there good planning with regards spill protection?
-
Is Environental monitoring being completed?
-
Is there any evidence of materials / liquids being deposited outside of site boundary? (e.g. Mud on road etc)<br>
Positive Site Observations
-
Positive observation
-
Environmental and Sustainability Document Review
-
Has the PMP been updated (from tender copy / to reflect site progress)?
-
Has the EMP been updated (from tender copy)?
-
Has the SWMP been updated (within the last 3 months)?
-
Has the project carried out spill training?
-
Have both documents been briefed out to key members of staff (supervisor and above)?
-
Are waste tickets being completed correctly?<br>(Please provide examples)<br>
Safety Documentation Review
-
Use this section to review current site documents, this includes SSOW, daily and weekly inspections, training, temporary works, fire RA, ERP, LOLER etc. Record the document reviewed and status for each document reviewed
Document Reviewed
-
Document Reference
-
Status
-
Causality
- Information Incomplete
- Information not updated
- Not briefed out
- SSOW not followed
- SSOW not understood
- Procedure not followed
- Procedure not understood
- Procedure Inaccurate
-
Closed out (Sign and Date)
SHEQ Bulletins
-
SHEQ bulletins up to date and relevant
Inspection Sign off
-
Add signature